ABL eMH1 Instruction Manual

Other manuals for eMH1: Instruction Manual
Manual is about: wallbox with charging cable

Summary of eMH1

  • Page 1

    Version: 5x2-2016-07-15 emh1 wallbox with socket instruction manual made in germany albert-büttner-straße 11 d-91207 lauf / pegnitz tel. +49 (0) 9123 188-0 fax +49 (0) 9123 188-188 info@abl.De www.Abl.De abl sursum bayerische elektrozubehör gmbh & co. Kg.

  • Page 2

    Ii contact manufacturer abl sursum bayerische elektrozubehör gmbh & co. Kg albert-büttner-straße 11 91207 lauf / pegnitz germany phone +49(0)9123 188-0 fax +49(0)9123 188-188 web www.Abl.De email info@abl.De support phone +49(0)9123 188-600 email emobility.Support@abl.De.

  • Page 3: Contents

    Iii contents contact ii safety and operating notices 1 safety notices in this manual 1 safety notices on the device 1 general safety information 2 operating instructions / maintenance 3 introduction 5 product description 5 identifying your product variant 6 package contents and unpacking 7 available...

  • Page 4

    Iv disruptions to the operation of the charging station and solutions 18 checking the integrated rccb (only for model variants with rccb) 20 taking the device out of operation 20 appendix 22 specifications 22 trademarks 24 ce certification and compliance declaration 25 glossary & definitions 25 dril...

  • Page 5: Safety and Operating Notices

    Safety and operating notices 1 safety and operating notices safety notices in this manual this instruction manual contains important information for the installation and safe use of the emh1 – evse 5x2 charging station it refers to. Please ensure therefore that you read and fol- low the safety notic...

  • Page 6

    Safety and operating notices 2 warning! Please ensure you read the instruction manual (this document), before you continue. In case the charging station is operated by several users, the contents of this manual and the safe- ty notices in particular must under all circumstances be passed on to each ...

  • Page 7

    Safety and operating notices 3 operating instructions / maintenance please note the following instructions for the operation and maintenance of your emh1 charging station: • the device must be connected to the protective earth conductor of your electricity supply. • ensure that the rated voltage and...

  • Page 8

    Safety and operating notices 4 danger! Should you discover any damage to the charging cable or a supply ca- ble, you must take the device out of operation immediately. In this case, please turn to an authorized service partner or the dealer from whom you purchased the product. You must not under any...

  • Page 9: Introduction

    Introduction 5 introduction congratulations on the purchase of your emh1 charging station by abl! With this charging station from our “electric mobility home“ series, you have chosen an innovative as well as future-proof product that guarantees particularly high operating safety while featuring extr...

  • Page 10: Evse502

    Introduction 6 identifying your product variant the emh1 series comprises several model variants, which are mechanically and/or electrically adapted to different usage profiles. For identification, a product compliance plate is located at the back of the lockable housing cover shield near the hinge....

  • Page 11

    Introduction 7 package contents and unpacking your emh1 charging station is delivered with a range of accessory components, which are necessary for the proper operation of the device. Therefore, please check immedi- ately after unpacking whether the following components are included: component quant...

  • Page 12

    Introduction 8 designation part number quantity mounting pole* for mounting all emh1 charging stations with or without bracket dimensions: 1600 x 280 x 70 cm weight: 2,000 g stemh10 1 mounting plate / bracket with fixings for all emh1 charging stations weight: 640 g whemh10 1 * does not include the ...

  • Page 13

    Installation and power supply connection 9 installation and power supply connection the electrical installation of the emh1 charging station model variants described in this manual must always be carried out by qualified specialist personnel: please contact an electrical contractor or arrange instal...

  • Page 14

    Installation and power supply connection 10 • do not install or operate the charging station in direct sunlight, as it could overheat and/or the housing could be damaged over time. Danger! In case of visible damage to the charging station occurring during instal- lation or use, the device must be ta...

  • Page 15

    Installation and power supply connection 11 caution! Check the measurements on the drilling template with a calibrated measuring tape before you mark the drill holes using the tem- plate and then drill them. Drilling the mounting holes using the drilling template proceed as follows to drill the hole...

  • Page 16

    Installation and power supply connection 12 it into operation must always be carried out by a qualified person or specialist electri- cal contractor. All local norms and regulations regarding the installation of electrical devices must be observed. Warning! Read and make sure that you follow all saf...

  • Page 17

    Installation and power supply connection 13 danger! The above color-coding is not internationally standardized: should the in- dividual wires in the power supply cable be color-coded differently, please immediately contact a qualified electrical contractor! Have the power supply checked and replaced...

  • Page 18

    Taking into operation and charging procedure 14 taking into operation and charging procedure your charging station is ready for use immediately after mechanical and electrical in- stallation have been completed. The evse 5x2 features a charging socket according to iec 62196-2, type 2. Accordingly, y...

  • Page 19

    Taking into operation and charging procedure 15 safety information for taking the charging station into operation before you take your evse 5x2 charging station into operation, you must observe the following safety notices: • ensure that the evse 5x2 is connected to the domestic power supply accordi...

  • Page 20

    Taking into operation and charging procedure 16 although the cable and connector are designed to withstand high mechanical stress- es, you should not drive your vehicle over the cable and/or the connector. Also ensure that the cable is not kinked at the charging socket and that there is no excessive...

  • Page 21: Resolving Errors

    Resolving errors 17 resolving errors your emh1 charging station is engineered for maximum operational safety and the highest possible charging reliability. The rccb and dc fault current detector (depend- ing on model variant) will recognize all internal malfunctions and switch the device off immedia...

  • Page 22

    Resolving errors 18 error messages during operation with the vehicle in some circumstances, malfunctions and disruptions may occur that prevent the proper charging of the vehicle according to iec 61851.1, mode 3. The evse 5x2 de- tects possible errors on the part of the vehicle independently and sho...

  • Page 23

    Resolving errors 19 please note: all evse model variants must be protected during operation either by an integrated or external rccb. Depending on the country, for model variants without dc fault current detection, an external type b rccb must be set aside in the domestic power distribution box. To ...

  • Page 24

    Resolving errors 20 please note: should there be a fault in the power supply that you cannot resolve yourself, please contact a qualified electrical contractor. Should there be a fault in relation to the internal rccb (all model variants except evse 552 and evse 562), please contact the local distri...

  • Page 25

    Resolving errors 21 3. Lock the cover shield again. 4. Now the evse5x2 cannot be used for charging. Please note: the evse 552 model variant has, in place of the integrated rccb, a switch that you can flick to position 0 to interrupt the control-pilot sig- nal to the charging socket and thereby preve...

  • Page 26: Appendix

    Appendix 22 appendix specifications model variant evse 502 evse 512 evse 522 compliance iec 61851-1/22 rated voltage 230/400 v 50 hz 230 v 50 hz 230/400 v 50 hz rated current 16 a (mcb required onsite) 32 a (mcb required onsite) 16 a (mcb required onsite) max output 11 kw 7.2 kw 11 kw charging socke...

  • Page 27

    Appendix 23 model variant evse 552 evse 562 evse 572 compliance iec 61851-1/22 rated voltage 230/400 v 50 hz 230 v 50 hz rated current 32 a (mcb required onsite) max output 22 kw 7.2 kw charging socket type 2, lockable circuit-protection devices external rccb required onsite rccb, type a, 30 ma and ...

  • Page 28

    Appendix 24 standard description 2002/96/ec weee guideline elektrog electrical and electronic device statute standards governing electromagnetic interference (emv) standard description din en 61000-6-2:2005 device interference protection for industrial applications din en 61000-6-3:2007 device inter...

  • Page 29

    Appendix 25 the absence of an explicit marking of trademarks used in this manual must not lead to the conclusion that a name is free from the rights of third parties. Ce certification and compliance declaration the emh1-evse 5x2 charging station carries the ce mark. The respective compliance declara...

  • Page 30

    Appendix 26 abbreviation description meaning reev range extended electric vehicle electric vehicle with range extension (using a small combustion engine or a fuel cell) rfid radio frequency identification identification using electromagnetic waves drilling template your emh1 charging station comes w...

  • Page 31

    Appendix 27 • all three screws and respective drill holes indicated on the drilling template must under all circumstances be used to fix emh1 charging stations. • ensure that the selected installation site is suitable for mounting the charging sta- tion with respect to substrate, power supply/cablin...

  • Page 32

    Appendix 28 however, the manufacturer further rejects any damage claims that can be shown to have resulted from improper use, neglect or modifications, from repair attempts by unauthorized persons or force majeure. Any assumed guarantees, including a guarantee of marketability or suitability for spe...

  • Page 33

    29.

  • Page 34: Emh1

    Version: 5x2-2016-07-15 emh1 wallbox with socket instruction manual made in germany albert-büttner-straße 11 d-91207 lauf / pegnitz tel. +49 (0) 9123 188-0 fax +49 (0) 9123 188-188 info@abl.De www.Abl.De abl sursum bayerische elektrozubehör gmbh & co. Kg.