Fedders C18ABD1 Installation & Operation Manual

Summary of C18ABD1

  • Page 1

    Installation, operation and maintenance 1.5 through 5 ton split system air conditioner introduction ..............................................................................1 notes to installer ....................................................................1 recognize safety symbols, words...

  • Page 2

    Introduction you have made a major investment in a fine piece of equipment. Keep your investment sound by reading these instructions before installing this unit. This will ensure that the full potential of this equipment is achieved. It will also be helpful in avoiding any needless service costs or ...

  • Page 3

    2 six feet clearance above the unit three feet clearance rain gutters concrete slab or preformed pad three feet clearance installation condensing unit location the condensing unit should be located outdoors as close as possible to the evaporator. Consider the following factors: clearances the air in...

  • Page 4

    Service valve connections braze joints 1. Remove the valve core from the schrader port. Wrap a quenching cloth around the service valve. Clean and flux the joint and braze with brazing rod containing at least 10% silver (such as silphos type brazing rod). Do not use soft solder. Replace the schrader...

  • Page 5

    4 connect refrigerant piping the following guidelines should be followed when installing refrigerant piping. Comply with all local, state, and federal codes and/or regulations pertaining to this type of equipment and its installation. 1. Run the tubing by the most direct route and support every few ...

  • Page 6

    1. If the furnace and air conditioner are on separate thermostats, turn the furnace thermostat off during the cooling season to prevent simultaneous operation of the heating and cooling systems. Reverse the procedure during the heating season. Adjust thermostat temperature and fan settings according...

  • Page 7

    6 24 ab 1 vf d c 18 = 18000 btu/h [5.28 kw] 24 = 24000 btu/h [7.03 kw] 30 = 30000 btu/h [8.79 kw] 36 = 36000 btu/h [10.55 kw] 42 = 42000 btu/h [12.31 kw] 48 = 48000 btu/h [14.07 kw] 60 = 60000 btu/h [17.5 kw] 1 = 208/230 volts, 1 phase, 60 hz 2 = 230 volts, 1 phase, 50 hz 3 = 208/230 volts, 3 phase,...

  • Page 8

    Model c10 & this warranty does not cover damage caused by: • improper installation • misuse of equipment • negligent servicing • improper applications • preventative maintenance • unauthorized modifications • improper electrical supply • failure to follow manufacturer’s instructions and rating plate...