IBC Water 500 series Installation & Operating Instructions Manual

Manual is about: 12 day timer

Summary of 500 series

  • Page 1

    As0715-e page 1 water softener series 500 12 day timer installation & operating instructions model : as0715-e serial no : ……………………….. Telephone: (07) 3219 2233 facsimile: (07) 3219 2266 email: sales@ibcwater.Com.Au website: www.Ibcwater.Com.Au filtration & water treatment products for commercial, in...

  • Page 2: Hardness Test

    As0715-e page 2 1. Water to be tested should be taken from a tap after the water softener 2. Measure 10ml of water into plastic bottle supplied (approximately 1/3 full) 3. Add one yes/no tablet to sample water, replace cap and shake until tablet has completely dissolved. (note: do not handle yes/no ...

  • Page 3: Model  As0715-E

    As0715-e page 3 to ascertain days between regeneration periods the following data or estimations are required. (let n be the number of days to be calculated) .1. ð water hardness in mg/l call ð h .2. ð water softener hardness removal capacity from table 1 in grams call ð c .3. ð daily water usage in...

  • Page 4: Location  &  Installation

    As0715-e page 4 location & installation 1. The softener should be located indoors or protected from the weather. 2. The softener requires an inlet water pressure between 140kpa (20psi) and 690kpa (100psi) and 240 volt 10 amp electric power supply. 2. The softener should service all water lines in th...

  • Page 5: Brine  Tank

    As0715-e page 5 placing the softener in service 1. Depress all skipper wheel tabs. 2. Turn knob (b) counter-clockwise until cam follower (g) has fully depressed drain valve stem (h). 3. Ensure the power is turned off at this stage. Open the installed inlet valve slightly and slowly fill the mineral ...

  • Page 6: Regeneration Frequency

    As0715-e page 6 regeneration frequency the softener can be set to regenerate from once per day up to once per 12 days. To determine the correct number of regenerations refer to the tables below for the model softener installed. The skipper wheel tabs are pushed in fully for the days selected for reg...

  • Page 7

    As0715-e page 7.

  • Page 8: 541-030 Valve

    As0715-e page 8 water conditioning control system installation, operating and maintenance manual 541-030 valve.

  • Page 9

    As0715-e page 9 cycle flow diagrams the service cycle position directs untreated water to flow down through the resin bed in the mineral tank and up through the riser tube. The water is conditioned when passing through the resin. The backwash cycle position directs water to flow down through the ris...

  • Page 10

    As0715-e page 10 programming general information the control valve is designed to initiate regeneration according to pre-set factory parameters. Following the instructions contained in this section will allow the installer to customise the program for the users exact needs. The regeneration cycle is...

  • Page 11

    As0715-e page 11 electromechanical power head parts list item p/n description qty 1. 15-76 screw 1 2. 529-309 time dial 1 3. 525-303 spring washer, (small) 1 4. 52-308 locating dial 1 5a. 529-232-1 gear, time of day (12 day) 1 5b. 529-232-2 gear, time of day (7 day) 1 6. 19-3 c -clip 1 7. 529-218 ac...

  • Page 12

    As0715-e page 12.

  • Page 13

    As0715-e page 13 valve body parts list item p/n description qty 1. 15-88 screw, backcap 4 2. 15-90 screw, solenoid mount 3 3. 413-134 * solenoid coil (specify voltage) 1 4. 413-60 spacer 1 5. 413-58 guide 1 6. 413-62 spring, plunger 1 7. 413-61 plunger, solenoid 1 8. 413-59 diaphragm, solenoid 1 9. ...

  • Page 14

    As0715-e page 14.

  • Page 15

    As0715-e page 15 troubleshooting guide problem cause solution 1. Unit fails to regenerate. A. Faulty electrical circuit. B. Defective clock motor. C. Low inlet pressure. D. Drain line restricted. E. All skipper tabs in the "out" position. F. The brine injector is plugged. G. Main diaphragm is torn. ...

  • Page 16

    As0715-e page 16 parts replacement general information familiarise yourself with the parts replacement procedures and component parts thoroughly before attempting any repair. Insure that the unit is in the bypass position and relieve the system pressure before attempting any repair procedure. Warnin...

  • Page 17

    As0715-e page 17 injector and filter screen replacement 1. Disconnect all electrical power to the control. 2. Place the bypass valve into the "bypass" position. 3. Remove the front dust cover from the timer assembly. 4. Relieve the system pressure by using a screwdriver to press down on the drain pl...

  • Page 18

    As0715-e page 18 15. Re-install the seat assembly, insure that one of the two (2) flats is facing towards the top of the valve body. 16. Re-install the main diaphragm and the timer assembly. 17. It is now necessary to reseat the rear check disc. Refer to the check disc replacement procedure. Backwas...

  • Page 19: Brine Valve Assembly

    As0715-e page 19 brine valve assembly windsor cabinet model float distance (x) as0715-e 100mm as0922-e 200mm as1029-e 260mm adjustment of softener brine valve 1. Lift float rod to full up position. 2. Set float to distance shown. Measure from the top of the crown nut to the bottom of the float..