J&B Importers Miami Sun Assembly Manual - page 16
Step 9-A) Chain Installation & Adjustment
1. Thread small 50 Link chain over CB or 3-spd. C.B. welded sprocket and unit
fixed sprocket. Connect the connecting link, align both sprockets, install axle
key and tighten set screw.
2. Slowly pull unit towards end of trike until chain slack is taken up.
3. Tighten the two small carriage bolts.
4. Turn chainwheel and see if chain runs smoothly with no binding or excessive noise.
If not, loosen bolts, move unit slightly forward. Tighten bolts and check chain
function again.
5. If chain now runs O.K. tighten all four carriage bolts securely, taking care that the
unit does not shift.
6. Proceed to Step 9 on Page 11.
3. Align the first most forward holes on unit legs with rear frame slot. Attach the two
smaller carriage bolts and finger tighten. Note that the heads are outside the frame.
4. Make sure that the axle flange on unit is to the right side of unit & frame. Also unit
must be installed with support bars up so that the basket can rest on them.
Note: Refer to general assembly instruction Pg. 7 through 13
(Fig. 15)
16