Wallhugger s-cape II MR Operation Manual

Summary of s-cape II MR

  • Page 1

    Edr10512 r1 5/05 document part no. 99300805 © leggett & platt, inc. Operation guide www.Lpadjustablebeds.Com.

  • Page 3: Contents

    Contents s-cape ii mr function ......................................................................................... 4 optional “j box” programming procedure ........................................................ 5 powerdown box operation . ........................................................

  • Page 4: S-Cape II Mr Function

    4 s- cape ii mr hand control operation guide s-cape ii mr function important information read advisory information in the owners manual carefully before using this product. The potential for electrical shock exists if electrical components are not installed or operated properly. S-cape ii mr operati...

  • Page 5: Powerdown Box Operation

    5 s- cape ii mr hand control operation guide optional “j box” programming procedure when programming the hand control, unplug the adjustable bed electrical power cord. Wait 30 seconds, then plug the cord back in to the power source. This simple process automatically sets the bed to the program mode ...

  • Page 6: S-Cape II Mr Programming

    6 s- cape ii mr hand control operation guide the two step procedure below is required to program 1 hand control to operate 1 bed. Before beginning, make certain the bed is plugged into a working grounded electrical outlet. Step 1 on bed 1, press the learn button for 1 second and release. The bed wil...

  • Page 7: S-Cape II Mr Programming

    7 s- cape ii mr hand control operation guide the three step procedure below is required to program 2 hand controls to operate 1 bed. Before beginning, make certain the bed is plugged into a working grounded electrical outlet. Step 1 on bed 1, press the learn button for 1 second and release. The bed ...

  • Page 8: S-Cape II Mr Programming

    8 s- cape ii mr hand control operation guide the three step procedure below is required to program 1 hand control to operate 2 beds. Before beginning, make certain the beds are plugged into a working grounded electrical outlet. Step 1 on bed 1, press the learn button for 1 second and release. The be...

  • Page 9: S-Cape II Mr Programming

    9 s- cape ii mr hand control operation guide hand control bed 1 hand control bed 2 the six step procedure below is required to program 2 hand controls to operate 2 beds. Before beginning, make certain the beds are plugged into a working grounded electrical outlet. Step 1 on bed 1, press the learn bu...

  • Page 10: S-Cape II Mr Reprogramming

    10 s- cape ii mr hand control operation guide the six step procedure below is required to separate 2 hand controls from operating 2 beds. One hand control per bed operation will result. Before beginning, make certain the beds are plugged into a working grounded electrical outlet. Step 1 on bed 1, pr...