3Com COREBUILDER 7000HD Installation Manual

Manual is about: 32 MB MEMORY UPGRADE

Summary of COREBUILDER 7000HD

  • Page 1

    ® http://www.3com.Com/ 32 mb m emory u pgrade for the c ore b uilder 7000hd s witch i nstallation g uide part no. Dia37ou-1aaa02 published november 1998.

  • Page 2

    Ii 3com corporation 5400 bayfront plaza santa clara, california 95052-8145 copyright © 1998, 3com corporation. All rights reserved. No part of this documentation may be reproduced in any form or by any means or used to make any derivative work (such as translation, transformation, or adaptation) wit...

  • Page 3: Ontents

    C ontents a bout t his g uide scope of this guide i who should use this guide i organization i conventions ii related documentation ii 1 i ntroduction general 1-1 installation upgrade kit 1-1 safety precautions 1-2 esd safety information 1-2 information sur la prévention de décharges électrostatique...

  • Page 4

    Iv.

  • Page 5: Bout

    A bout t his g uide scope of this guide the 32mb memory upgrade for the corebuilder 7000hd switch installation guide provides all the information needed to mount the 32mb memory simm on the corebuilder 7000hd switch module. This document provides a step-by-step installation procedure for the 32mb me...

  • Page 6

    Ii a bout t his g uide conventions table 1 lists the icons and typographical conventions used in this guide. Notice icons indicate statements that you need to read before continuing in the guide. Table 1 describes these icons. Related documentation the complete documentation for the interface boards...

  • Page 7

    Related documentation iii learn about atm and how it is implemented in the corebuilder 7000 atm switch. User guide learn about lan emulation and how it is implemented in the corebuilder 7000 atm switch. User guide find out what type of configuration tasks you can perform on the corebuilder 7000 atm ...

  • Page 8

    Iv a bout t his g uide.

  • Page 9: Ntroduction

    1 i ntroduction general the corebuilder 7000hd switch engine 32mb memory upgrade kit (3c37041) increases the atm switching capacity, measured in calls, by a factor of four to five. This upgrade is available in conjunction with the corebuilder 7000 family software version 4.0, and replaces the existi...

  • Page 10

    1-2 c hapter 1: i ntroduction installation upgrade kit safety precautions before working with any component in the corebuilder 7000 system, read and adhere to the following safety precautions. Esd safety information electrostatic discharge (esd) can damage components on the system module. Esd, which...

  • Page 11

    Safety precautions 1-3 information sur la prévention de décharges électrostatiques les décharges électrostatiques peuvent endommager des éléments du module. Ces décharges, qui surviennent lors d’une manipulation inadéquate du module, peuvent entraîner une défaillance temporaire ou permanente. Attent...

  • Page 12

    1-4 c hapter 1: i ntroduction vorsicht: zur verhütung von schadën durch esd: vergewissern sie sich, daß sie richtig geerdet sind. Benutzen sie ein fußband und eine geerdete matte oder tragen sie ein geerdetes handgelenkband mit gutem hautkontakt. Lassen sie das modul bis zur installation in der anti...

  • Page 13: 32M

    2 32m b m emory u pgrade i nstallation on the c ore b uilder 7000hd s witch m odule 32mb memory upgrade steps step 1 removing the corebuilder 7000hd switch module from the chassis before starting, make sure that you wearing the esd wrist strap and that you are properly connected to grounding equipme...

  • Page 14

    2-2 c hapter 2: 32m b m emory u pgrade i nstallation on the c ore b uilder 7000hd s witch m odule loosening the captive screws grasp the ejector handles of the card and push them outward (figure 2-2). This ejects the card slightly. You may have to apply considerable force to the handles in order to ...

  • Page 15

    32mb memory upgrade steps 2-3 opening the ejector handles make sure that the screws have been loosened enough so that they “float” in the holes and do not catch on the front panel. Keeping the ejectors in the openmost position, remove the switch module by sliding it outwards. If you experience diffi...

  • Page 16

    2-4 c hapter 2: 32m b m emory u pgrade i nstallation on the c ore b uilder 7000hd s witch m odule inserting the special key raise the key and slide the switch module out (figure 2-4). Sliding the switch module out using both hands, pull the switch module out..

  • Page 17

    32mb memory upgrade steps 2-5 only use the special key provided if you have difficulty in removing the switch module. Place the switch module on a grounded surface or antistatic bag with all components facing up. Step 2 removing the 16mb memory simm the memory simm is located on the lower left corne...

  • Page 18

    2-6 c hapter 2: 32m b m emory u pgrade i nstallation on the c ore b uilder 7000hd s witch m odule side view of the memory simm with your thumbs, push the clips outward to release the simm. When pressed, the simm releases and rises slightly (figure 2-7). Removing the 16mb simm with your thumb and ind...

  • Page 19

    32mb memory upgrade steps 2-7 removing the 16mb simm at a 45 degree angle step 3 inserting the 32mb memory simm remove the 32mb memory simm from the packaging material. Make sure that the front panel of the switch module is facing you, and that the switch is on proper grounding material, or an antis...

  • Page 20

    2-8 c hapter 2: 32m b m emory u pgrade i nstallation on the c ore b uilder 7000hd s witch m odule inserting the 32mb memory simm with one or two fingers (not on the chips) gently press down. A click is heard when the simm is in place (figure 2-10). Pushing the 32mb simm in place cutout.

  • Page 21

    Verifying 32mb memory upgrade 2-9 step 4 returning the corebuilder 7000hd switch module back to the chassis orient the switch module so its labelling is upright and make sure the eject handles are in the outward position. Insert the module into the chassis by placing it in the guides of the selected...

  • Page 22

    2-10 c hapter 2: 32m b m emory u pgrade i nstallation on the c ore b uilder 7000hd s witch m odule.

  • Page 23: Ndex

    I ndex numbers 16mb memory simm removing 2-5 32mb memory upgrade verifying 2-9 32mb memory upgrade installation guide i 8-port board i a administration console iii assembly kit i atm switch ii c conventions used in this guide ii corebuilder 7000 installation and startup guide ii corebuilder 7000 swi...

  • Page 24

    2 i ndex v verifying memory upgrade 2-9 w who should use this guide i.