3D Systems ProJet 5000 Manual

Summary of ProJet 5000

  • Page 1

    1. Projet™ 5000 printer facility requirements guide table of contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1 01.0 about this manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....

  • Page 2: Table of Contents

    Projet™ 5000 printer facility requirements guide table of contents 01.0 about this manual 02.0 what is a facility requirements guide 03.0 symbols used in this guide 04.0 the projet™ production printing system 04.1 what is included with a projet™ production printing system 05.0 facility guidelines 05...

  • Page 3

    What's inside: a description of hardware, software, part material, networking components, and documentation that comprise the projet™ production printing system. An overview of the site requirements in typical engineering and design work spaces. These involve basic access, electrical, and environmen...

  • Page 4: 05.0 Facility Guidelines

    One licensed copy of 3d systems projet® client software with integrated online help and quick reference guide region-specific projet™ production printing system "country kit" consisting of: one power cable kit for of a country-appropriate power, and a voltage warning document one pack of nitrile glo...

  • Page 6

    05.2 access area surrounding printers at least 36" (908mm) of unobstructed floor space is recommended around each accomodate, to allow unobstructed service access to the drawers, hood and doors. Store crate where it will be easy access to wheel locks or have a jack lift available for the 3d systems ...

  • Page 7

    When moving, do not push from the front of the printer. It can tip over if casters are on uneven flooring. Always push printer from the side. 05.4 electrical the ac voltage and current requirements for the projet™ production printing system are: 115 vac, 50/60 hz (dedicated 20 amp breaker) 230 vac, ...

  • Page 8

    Minimum system requirements operating system windows xp/windows vista/ windows 7 processor intel® pentium® 4 processor memory 1 gb ram hard drive 4 gb free space video graphics adaptor with opengl 3d acceleration, true color at 1024x768 resolution network ethernet network infrastructure with tcp/ip ...

  • Page 9: 06.0 Operating Enviroment

    05.8 material bottle disposal used part material bottles must be disposed of in a manner consistent with local and other applicable laws and regulations governing such materials. Refer to the visijet® materials' msds sheets prior to shipment of the projet™ production modeling system. Discuss your or...

  • Page 10

    Caution: do not install a projet™ production printing system in the same area as equipment with heavy vibration, or airborne contaminants that may adversely affect the printer's performance. 06.2 humidity humidity should be maintained at less than 50% non-condensing. 06.3 lighting the projet™ produc...

  • Page 11

    1. 2. 3. 4. 5. 6. 1. 2. 3. 4. Material bottles: the printer has up to four material delivery modules for build materials and up to four material delivery modules for support materials. The support delivery modules are located on the left side and the build is located on the right side of the printer...

  • Page 12: 09.0 Limitation of Liability

    Note: retain the shipping crate, brackets and hardware incase the projet™ production printing system needs to be shipped back to the manufacturer for repair. These crates are designed to allow fast, easy removal and packaging of the product. If printer needs to be return to the manufacturer, contact...

  • Page 13

    Returning the advance preparation checklist? Return the completed checklist via the method chosen below: fax to the account representative's fax number (above): fax to the _________________________________________ office fax number (see above) fax or mail to: _____________________________________ ac...

  • Page 14

    Before the printer is installed into this facility, we acknowledge that the installation site complies with the specifications stated in the projet™ facility requirements guide. Once the printer is installed, we agree not to alter any requirements without consulting with 3d systems' customer service...