Page 2
Tehi95094 – rev. 2 2/ 12 do not perform any of the activities described on this document with the sectionalizer energized. All the activities listed on this document it must be performed with the sectionalizer completely de-energized and out of service. Always follow your company safety procedures b...
Page 3
Tehi95094 – rev. 2 3/ 12 table of contents 1. Introduction .................................................................................................................................................... 4 2. Packing and transportation ...............................................................
Page 4
Tehi95094 – rev. 2 4/ 12 1. Introduction this document contains the required information to install medium voltage autolink sectionalizer and put it into service. For a correct use of the product, please read it carefully. Like every apparatus we manufacture, autolink is designed for specific applic...
Page 5
Tehi95094 – rev. 2 5/ 12 4. Storage when the apparatus is unboxed, it must be carefully unpacked and checked as described in chapter 3 of this manual. If immediate installation is not possible, the product should be kept in its original packing. If immediate installation is not possible, store the e...
Page 6
Tehi95094 – rev. 2 6/ 12 6.3 initial setting or previous setting modification instructions remove the top cap (fig. 1 a) using a 34mm fork spanner holding the tube with the hand (fig. 1 b). Check condition of o-ring (fig. 2 e), and replace it if necessary, applying grease on it. Set the dip-switches...
Page 7
Tehi95094 – rev. 2 7/ 12 6.4 dip-switch configuration once the calibration current and counts are set, cover the dip-switch with silicon grease (fig. 3), supplied with autolink. Check the condition of the o-ring (fig. 2 e) and apply silicon grease (fig. 4 f) both inside the cap and over the dip-swit...
Page 8
Tehi95094 – rev. 2 8/ 12 place the cap, holding the tube with the hand, and tighten it using a 34 mm fork spanner (torque between 8 and 10 nm) without damaging the o-ring (fig. 5). 6.5 autolink repositioning push the interlocking bolt (fig. 6) until blocked (it will rotate freely). Do not strike the...
Page 9
Tehi95094 – rev. 2 9/ 12 turn the tripping pin 90°, until the lower contact is firmly blocked (fig. 8) place the pole in the tube inferior eyelet (fig. 9) and position in the cutout-base..
Page 10
Tehi95094 – rev. 2 10/ 12 withdraw the pole and place it in the tube’s superior eyelet (fig. 10). Push it until it remains in closing position..
Page 11
Tehi95094 – rev. 2 11/ 12 7. Commissioning 7.1 general procedures when commissioning, all operations must be carried out by suitable qualified customer personnel with in-depth knowledge of the apparatus and the installation itself. It is not recommended to open autolink under charge using a common h...