ABB RET650 2.1 IEC Commissioning Manual

Manual is about: Transformer protection

Summary of RET650 2.1 IEC

  • Page 1

    Relion ® 650 series transformer protection ret650 2.1 iec commissioning manual.

  • Page 3

    Document id: 1mrk 504 160-uen issued: january 2016 revision: - product version: 2.1 © copyright 2016 abb. All rights reserved.

  • Page 4

    Copyright this document and parts thereof must not be reproduced or copied without written permission from abb, and the contents thereof must not be imparted to a third party, nor used for any unauthorized purpose. The software and hardware described in this document is furnished under a license and...

  • Page 5

    Disclaimer the data, examples and diagrams in this manual are included solely for the concept or product description and are not to be deemed as a statement of guaranteed properties. All persons responsible for applying the equipment addressed in this manual must satisfy themselves that each intende...

  • Page 6

    Conformity this product complies with the directive of the council of the european communities on the approximation of the laws of the member states relating to electromagnetic compatibility (emc directive 2004/108/ec) and concerning electrical equipment for use within specified voltage limits (low-...

  • Page 7

    Table of contents section 1 introduction.......................................................................7 this manual........................................................................................ 7 intended audience.......................................................................

  • Page 8

    Checking optical connections........................................................... 37 section 5 configuring the ied and changing settings....................39 overview...........................................................................................39 configuring analog ct inputs........

  • Page 9

    Enable forcing by using lhmi................................................ 59 enable forcing using testmode function block...................60 how to change binary input/output signals using forcing............ 60 forcing by using lhmi........................................................... 60...

  • Page 10

    Completing the test................................................................ 76 breaker failure protection, phase segregated activation and output ccrbrf...........................................................................76 checking the phase current operate value, ip> ...................

  • Page 11

    Gas medium supervision ssimg................................................ 92 testing the liquid medium supervision for alarm and lock out conditions......................................................................... 93 completing the test........................................................

  • Page 12

    Measurement of service currents......................................... 108 restoring.............................................................................. 109 section 13 glossary....................................................................... 111 table of contents 6 transformer prot...

  • Page 13

    Section 1 introduction 1.1 this manual the commissioning manual contains instructions on how to commission the ied. The manual can also be used by system engineers and maintenance personnel for assistance during the testing phase. The manual provides procedures for the checking of external circuitry...

  • Page 14

    1.3 product documentation 1.3.1 product documentation set iec07000220-4-en.Vsd p la n n in g & p u rc h a se e n gi n e e rin g in st a lli n g c o m m is si o n in g o p e ra tio n m ai n te n a n ce d e co m m is si o n in g d e in st a lli n g & d is p o sa l application manual operation manual i...

  • Page 15

    Well as verifying settings by secondary injection. The manual describes the process of testing an ied in a station which is not in service. The chapters are organized in the chronological order in which the ied should be commissioned. The relevant procedures may be followed also during the service a...

  • Page 16

    650 series manuals document numbers operation manual 1mrk 500 125-uen engineering manual 1mrk 511 381-uen installation manual 1mrk 514 025-uen communication protocol manual, dnp3 1mrk 511 374-uus communication protocol manual, iec 60870-5-103 1mrk 511 377-uen communication protocol manual, iec 61850...

  • Page 17

    A hazard which could result in corruption of software or damage to equipment or property. The information icon alerts the reader of important facts and conditions. The tip icon indicates advice on, for example, how to design your project or how to use a certain function. Although warning hazards are...

  • Page 18

    Illustrations are used as an example and might show other products than the one the manual describes. The example that is illustrated is still valid. 1.5 iec 61850 edition 1 / edition 2 mapping table 1: iec 61850 edition 1 / edition 2 mapping function block name edition 1 logical nodes edition 2 log...

  • Page 19

    Function block name edition 1 logical nodes edition 2 logical nodes l4ufcnt l4ufcnt l4ufcnt lcpttr lcpttr lcpttr ld0lln0 lln0 lln0 ldlpsch ldlpdif ldlpsch lfpttr lfpttr lfpttr lmbrflo lmbrflo lmbrflo lovptuv lovptuv lovptuv lphd lphd lphd lt3cpdif lt3cpdif lt3cgapc lt3cpdif lt3cphar lt3cptrc mvgapc ...

  • Page 20

    Function block name edition 1 logical nodes edition 2 logical nodes spc8gapc spc8ggio spc8gapc spgapc spggio spgapc sscbr sscbr sscbr ssimg ssimg ssimg ssiml ssiml ssiml sxcbr sxcbr sxcbr sxswi sxswi sxswi t3wpdif t3wpdif t3wgapc t3wpdif t3wphar t3wptrc teigapc teiggio teigapc teilgapc teilggio teil...

  • Page 21

    Section 2 safety information 2.1 symbols on the product all warnings must be observed. Read the entire manual before doing installation or any maintenance work on the product. All warnings must be observed. Class 1 laser product. Take adequate measures to protect your eyes and do not view directly w...

  • Page 22

    Always use suitable isolated test pins when measuring signals in open circuitry. Potentially lethal voltages and currents are present. Never connect or disconnect a wire and/or a connector to or from a ied during normal operation. Hazardous voltages and currents are present that may be lethal. Opera...

  • Page 23

    2.3 caution signs whenever changes are made in the ied, measures should be taken to avoid inadvertent tripping. The ied contains components which are sensitive to electrostatic discharge. Esd precautions shall always be observed prior to touching components. Always transport pcbs (modules) using cer...

  • Page 24

    18.

  • Page 25

    Section 3 available functions 3.1 main protection functions table 2: example of quantities 2 = number of basic instances 0-3 = option quantities 3-a03 = optional function included in packages a03 (refer to ordering details) iec 61850 ansi function description transformer ret650 (a05) differential pr...

  • Page 26

    3.3 control and monitoring functions iec 61850 ansi function description transformer ret650 (a05) control qcbay apparatus control 1 locrem handling of lrswitch positions 1 locremctrl lhmi control of psto 1 slgapc logic rotating switch for function selection and lhmi presentation 15 vsgapc selector m...

  • Page 27

    Iec 61850 ansi function description transformer ret650 (a05) itbgapc integer to boolean 16 conversion with logic node representation 16 teigapc elapsed time integrator with limit transgression and overflow supervision 12 intcomp comparator for integer inputs 12 realcomp comparator for real inputs 12...

  • Page 28

    Table 3: total number of instances for basic configurable logic blocks basic configurable logic block total number of instances and 280 gate 40 inv 420 lld 40 or 280 pulsetimer 40 rsmemory 40 srmemory 40 timerset 60 xor 40 3.4 communication iec 61850 ansi function description transformer ret650 (a05...

  • Page 29

    Iec 61850 ansi function description transformer ret650 (a05) goosemvrcv goose function block to receive a measurand value 60 goosesprcv goose function block to receive a single point value 64 multicmdrcv/ multicmdsnd multiple command and transmit 60/10 front, lanabi, lanab, lancdi, lancd, gateway et...

  • Page 30

    Iec 61850 or function name description dstbegin, dstenable, dstend gps time synchronization module irig-b time synchronization setgrps number of setting groups actvgrp parameter setting groups testmode test mode functionality chnglck change lock function smbi signal matrix for binary inputs smbo sig...

  • Page 31

    Iec 61850 or function name ansi description ledgen general led indication part for lhmi openclose_led lhmi leds for open and close keys grp1_led1– grp1_led15 grp2_led1– grp2_led15 grp3_led1– grp3_led15 basic part for cp hw led indication module 1mrk 504 160-uen - section 3 available functions transf...

  • Page 32

    26.

  • Page 33

    Section 4 starting up 4.1 factory and site acceptance testing testing the proper ied operation is carried out at different occasions, for example: • acceptance testing • commissioning testing • maintenance testing this manual describes the workflow and the steps to carry out the commissioning testin...

  • Page 34

    • pc with pcm600 installed along with the connectivity packages corresponding to the ieds to be tested. • administration rights on the pc, to set up ip addresses • product documentation (engineering manual, installation manual, commissioning manual, operation manual, technical manual and communicati...

  • Page 35

    • software version, main menu/diagnostics/ied status/product identifiers. • serial number, main menu/diagnostics/ied status/product identifiers. • installed modules and their ordering number, main menu/diagnostics/ied status/installed hw. 4.4.2 ied start-up sequence when the ied is energized, the gr...

  • Page 36

    • direct point-to-point link between pcm600 and the ied front port. The front port can be seen as a service port. • indirect link via a station lan or from remote via a network. The physical connection and the ip address must be configured in both cases to enable communication. The communication pro...

  • Page 37

    Administrator rights are required to change the pc communication setup. It is automatically detected that tx signals from the ied are received on the tx pin on the pc. Thus, a straight (standard) ethernet cable can be used. 1. Select search programs and files in the start menu in windows. Iec1300005...

  • Page 38

    Iec13000058-1-en.Vsd iec13000058 v1 en figure 5: click view network connections 3. Right-click and select properties. Iec13000059-1-en.Vsd iec13000059 v1 en figure 6: right-click local area connection and select properties 4. Select the tcp/ipv4 protocol from the list of configured components using ...

  • Page 39

    Iec13000060-1-en.Vsd iec13000060 v1 en figure 7: select the tcp/ipv4 protocol and open properties 5. Select use the following ip address and define ip address and subnet mask if the front port is used and if the ip address is not set to be obtained automatically by the ied, see figure 8 . The ip add...

  • Page 40

    Iec13000062-1-en.Vsd iec13000062 v1 en figure 8: select: use the following ip address 6. Use the ping command to verify connectivity with the ied. 7. Close all open windows and start pcm600. The pc and ied must belong to the same subnetwork for this set-up to work. Setting up the pc to access the ie...

  • Page 41

    4.7 checking ct circuits check that the wiring is in strict accordance with the supplied connection diagram. The cts must be connected in accordance with the circuit diagram provided with the ied, both with regards to phases and polarity. The following tests shall be performed on every primary ct co...

  • Page 42

    4.8 checking vt circuits check that the wiring is in strict accordance with the supplied connection diagram. Correct possible errors before continuing to test the circuitry. Test the circuitry. • polarity check when applicable; this test is often omitted for cvts • vt circuit voltage measurement (pr...

  • Page 43

    Verify that the contact sockets have been crimped correctly and that they are fully inserted by tugging on the wires. Never do this with current circuits in service. Current circuit 1. Verify that the contacts are of current circuit type. 2. Verify that the short circuit jumpers are located in the c...

  • Page 44

    An ied equipped with optical connections has an minimum space requirement of 180 mm for plastic fiber cables and 275 mm for glass fiber cables. Check the allowed minimum bending radius from the optical cable manufacturer. Section 4 1mrk 504 160-uen - starting up 38 transformer protection ret650 2.1 ...

  • Page 45

    Section 5 configuring the ied and changing settings 5.1 overview the customer specific values for each setting parameter and a configuration file have to be available before the ied can be set and configured, if the ied is not delivered with a configuration. Use the configuration tools in pcm600 to ...

  • Page 46

    5.2 configuring analog ct inputs the analog input channels must be configured to get correct measurement results as well as correct protection functionality. Because all protection algorithms in the ied utilize the primary system quantities, it is extremely important to make sure that connected curr...

  • Page 47

    Each logical i/o module has an error flag that indicates signal or module failure. The error flag is also set when the physical i/o module of the correct type is not detected in the connected slot. 1mrk 504 160-uen - section 5 configuring the ied and changing settings transformer protection ret650 2...

  • Page 48

    42.

  • Page 49

    Section 6 establishing connection and verifying the spa/iec communication 6.1 entering settings if the ied is connected to a monitoring or control system via the rear spa/iec port, the spa/iec port has to be set either for spa or iec use. 6.1.1 entering spa settings the spa/iec port is located on th...

  • Page 50

    1. Set the operation of the rear spa/iec port to “iec”. The operation of the rear spa/iec port can be found on the local hmi under main menu/configuration/communication/slm configuration/rear optical spa-iec-dnp port/protocol:1 when the setting is entered the ied restarts automatically. After the re...

  • Page 51

    1. Check that the master system time-out for response from the ied, for example after a setting change, is > 40 seconds. 2. Use a protocol analyzer and record the communication between the ied and the iec master. Check in the protocol analyzer’s log that the ied answers the master messages. 3. Gener...

  • Page 52

    46.

  • Page 53

    Section 7 establishing connection and verifying the lon communication 7.1 communication via the rear ports 7.1.1 lon communication lon communication is normally used in station automation systems. Optical fiber is used within the substation as the physical communication link. The test can only be ca...

  • Page 54

    The fibre optic lon bus is implemented using either glass core or plastic core fibre optic cables. Table 9: specification of the fibre optic connectors glass fibre plastic fibre cable connector st-connector snap-in connector cable diameter 62.5/125 m 1 mm max. Cable length 1000 m 10 m wavelength 820...

  • Page 55

    • the node addresses of the other connected ieds. • the network variable selectors to be used. This is organized by lnt. The node address is transferred to lnt via the local hmi by setting the parameter servicepinmsg = yes. The node address is sent to lnt via the lon bus, or lnt can scan the network...

  • Page 56

    Path in the local hmi under main menu/configuration/communication/slm configuration/rear optical lon port table 12: ade non group settings (basic) name values (range) unit step default description operation off on - - off operation timerclass slow normal fast - - slow timer class path in the local h...

  • Page 57

    Section 8 establishing connection and verifying the iec 61850 communication 8.1 overview the rear oem ports are used for: • station bus (iec 61850-8-1) communication. For iec 61850-8-1 redundant communication, both rear oem ports are utilized. 8.2 setting the station communication to enable iec 6185...

  • Page 58

    The ied will restart after confirmation. Menu items lanab:1 and lancd:1 are hidden in local hmi after restart but are visible in pst where the values for parameter mode is set to duo. 8.3 verifying the communication to verify that the communication is working a test/analyzing tool, for example itt60...

  • Page 59

    Section 9 testing ied operation 9.1 preparing for test 9.1.1 requirements ied test requirements: • calculated settings • application configuration diagram • signal matrix (smt) configuration • terminal connection diagram • technical manual • three-phase test equipment • pcm600 the setting and config...

  • Page 60

    Chapter. The functions can be tested in any order according to user preferences. Only the functions that are used (operation is set to on) should be tested. The response from a test can be viewed in different ways: • binary outputs signals • service values on the local hmi (logical signals or phasor...

  • Page 61

    Amplitudes and phase angles. In addition, pcm600 contains the disturbance handling tool. The content of reports generated by the disturbance handling tool can be configured which makes the work more efficient. For example, the tool may be configured to only show time tagged events and to exclude ana...

  • Page 62

    9.3 preparing the connection to the test equipment the ied can be equipped with a test switch of type rtxp8, rtxp18 or rtxp24. The test switch and its associated test plug handle (rtxh8, rtxh18 or rtxh24) are a part of the combitest system, which provides secure and convenient testing of the ied. Wh...

  • Page 63

    In the logic diagram for the function under test are connected to the corresponding binary inputs and outputs of the ied under test. To ensure correct results, make sure that the ied as well as the test equipment are properly earthed before testing. Il1 il2 il3 in ul1 ul2 ul3 un il1 il2 il3 ul1 in (...

  • Page 64

    Be individually blocked to ensure that no events are reported to a remote station during the test. This is done by setting the parameter evdisable to yes. Any function is blocked if the corresponding setting in the local hmi under main menu/test/function test modes menu remains on, that is, the para...

  • Page 65

    9.7 testing the protection functionality each protection function must be tested individually by secondary injection. • verify operating levels (trip) and timers. • verify alarm and blocking signals. • use the disturbance handling tool in pcm600 to evaluate that the protection function has received ...

  • Page 66

    Iec15000029 v1 en 2. Exit back to the root menu. 3. Select yes in the save dialogue box. Once the ied is in test mode the yellow start led starts to blink. 9.8.2.2 enable forcing using testmode function block • use the testmode function block, appropriately configured in pcm600/act. It may be conven...

  • Page 67

    Iec15000021 v1 en figure 11: value line of the desired signal 3. Use the up/down arrows on the lhmi to change the signal value or the appropriate menu in pcm600. The status of the signal changes automatically to forced (i.E. There is no need to set the status to forced manually). On the lhmi, these ...

  • Page 68

    “frozen” at the value selected by the user, even if the ied is switched off and back on again. Freezing a signal value without changing it • set the status of a signal to forced, in the forcing menu that corresponds to the i/ o card in question. See example of lhmi menu in figure 12 iec15000020 v1 e...

  • Page 69

    Iec15000023 v1 en 4. Click start editing signal value for forcing on the tool bar. Iec15000024 v1 en the signal monitoring menu changes and indicates the forcing values that can be edited. Iec15000025 v1 en 5. Select and edit the values. 6. Click acknowledge and send. Iec15000026 v1 en this commits ...

  • Page 70

    Iec15000032 v1 en regardless if the forcing changes are commited or canceled, the forcing is still active. To force more signals, click the button start editing signal value for forcing again. 9.8.4 how to undo forcing changes and return the ied to normal operation regardless of which input/output s...

  • Page 71

    1. Uncheck forcing session under the menu ied. Iec15000031 v1 en 2. Click yes in the confirmation dialogue box. Pcm600 will revert all forced signals back to unforced and the real signal values will immediately take effect again. This may change both binary input values and output relay states and w...

  • Page 72

    66.

  • Page 73

    Section 10 testing functionality by secondary injection 10.1 testing disturbance report 10.1.1 introduction the following sub-functions are included in the disturbance report function: • disturbance recorder • event list • event recorder • trip value recorder • indications if the disturbance report ...

  • Page 74

    A new recording begins. The view is updated if you leave the menu and return. 1.2. Navigate to general information or to trip values to obtain more detailed information. 2. Open the disturbance handling tool for the ied in the plant structure in pcm600. 2.1. Right-click and select execute manual tri...

  • Page 75

    Internal event list or main menu/clear/clear process event list. It is not possible to clear the event lists from pcm600. When testing binary inputs, the event list (el) might be used instead. No uploading or analyzing of registrations is then needed since the event list keeps running, independent o...

  • Page 76

    8. Connect the timer and set the current to twice the operate value. 9. Switch on the current and note the operate time. 10. Check in the same way the measuring circuits connected to the cts on the lv side and other current inputs to the transformer differential protection. 11. Finally check that tr...

  • Page 77

    In the neutral-to-earth circuit with the same phase angle and with polarity corresponding to an internal fault. 8. Increase the current injected in l1, and note the operate value. Decrease the current slowly and note the reset value. 9. Inject current into terminals l2 and l3 in the same way as in s...

  • Page 78

    Observe: do not exceed the maximum permitted overloading of the current circuits in the ied. 5. Compare the measured operating current with the set value. 6. Set the operation mode to 2 out of 3 and inject current into one of the phases. Check - no operation. 10.4.1.2 completing the test continue to...

  • Page 79

    If 1 out of 3 currents for operation is chosen: the voltage angle of phase l1 is the reference. If 2 out of 3 currents for operation is chosen: the voltage angle of phase l1 – the voltage angle of l2 is the reference. If 3 out of 3 currents for operation is chosen: the voltage angle of phase l1 is t...

  • Page 80

    Ensure that the maximum continuous current, supplied from the current source used for the test of the ied, does not exceed four times the rated current value of the ied. 10.4.3.1 measuring the operate limit of set values 1. Inject a phase current into the ied with an initial value below that of the ...

  • Page 81

    7. Connect a trip output contact to a timer. 8. Set the injected current to 200% of the operate level of the tested step, switch on the current and check the time delay. For inverse time curves, check the operate time at a current equal to 110% of the operate current for txmin. 9. Check that all ope...

  • Page 82

    Check, in the same way, the operate and reset values of ibase1 for phases l2 and l3. 5. Activate the cooling input signal, thus switching to base current ibase2. 6. Check the operate and reset values (for all three phases) for ibase2 in the same way as described above for stage ibase1. 7. Deactivate...

  • Page 83

    At mode 2 out of 4 the phase current setting, ip> can be checked by single-phase injection where the return current is connected to the summated current input. The value of residual (earth fault) current in set lower than ip> is easiest checked in back- up trip mode 1 out of 4. 10.4.6.1 checking the...

  • Page 84

    10.4.6.4 verifying the re-trip mode choose the mode below, which corresponds to the actual case. In the cases below it is assumed that functionmode = current is selected. Checking the case without re-trip, retripmode = retrip off 1. Set retripmode = retrip off. 2. Apply the fault condition, includin...

  • Page 85

    The normal mode butripmode = 1 out of 3 should have been verified in the tests above. In applicable cases the modes 1 out of 4 and 2 out of 4 can be checked. Choose the mode below, which corresponds to the actual case. Checking the case butripmode = 1 out of 4 it is assumed that the earth-fault curr...

  • Page 86

    10.4.6.7 verifying the case retripmode = contact it is assumed that re-trip without current check is selected, retripmode = contact. 1. Set functionmode = contact 2. Apply input signal for cb closed to relevant input or inputs cbcldl1, cbcld2 or cbcdl3. 3. Apply the input signal, or signals for the ...

  • Page 87

    6. Apply the fault and the start again. The value of current should be below the set value i>blkcont. 7. Arrange disconnection of bc closed signal(s) well before set back-up trip time t2. It simulates a correct cb tripping. 8. Verify that back-up trip is not achieved. Re-trip can appear for example,...

  • Page 88

    To be tested is unblocked and other functions that might disturb the evaluation of the test are blocked. 2. Connect the test set for injection of three-phase currents to the appropriate current terminals of the ied. 3. Inject current(s) in a way that relevant measured current (according to setting p...

  • Page 89

    Overall check in principal as above (non-directional overcurrent feature) 3. Operate value measurement the relevant voltage restraining value (according to setting parameter voltageinput) has also to be injected from the test set and the influence on the operate value has to be calculated when testi...

  • Page 90

    1. Connect the test set for injection three-phase voltages to the appropriate voltage terminals of the ied. 2. Inject voltage(s) in a way that relevant measured (according to setting parameter voltageinput) voltages are created from the test set. 3. Overall check in principal as above (non-direction...

  • Page 91

    Blku and blkz signals should appear simultaneously wether the blku and blkz reset depends on the setting sealin “on” or “off”. If “on” no reset, if “off” reset. 7. After more than 5 seconds disconnect the remaining two-phase voltages and all three currents. • there should be no change in the high st...

  • Page 92

    2 1 2 3 2 3 l l l i i a i a i × = + × + × iecequation00021 v1 en (equation 2) where: 1 2 3 l l l i i and i , iecequation00020 v1 en are the measured phase currents 2 3 3 1 0, 5 2 j a e j p × = × = - + . Iecequation00022 v2 en 7. Compare the result with the set value of the negative-sequence operatin...

  • Page 93

    0 l1 l2 l3 3 = i i i i × + + iecequation00019 v1 en (equation 4) where: 1 2 3 l l l i i and i , iecequation00020 v1 en are the measured phase currents 7. Compare the result with the set value of the zero-sequence operate current. Consider that the set value 3i0 is in percentage of the base current i...

  • Page 94

    The blku, blkz and 3ph signals should not appear. 5. Repeat step 2 . 6. Connect the nominal voltages in all three phases and feed a current below the operate level in all three phases. 7. Keep the current constant. Disconnect the voltage in all three phases simultaneously. The blku, blkz and 3ph sig...

  • Page 95

    Function (singlecmd) is then checked from the local hmi by applying the commands with mode = off, steady or pulse, and by observing the logic statuses of the corresponding binary output. Command control functions included in the operation of different built-in functions must be tested at the same ti...

  • Page 96

    With a test set and with the autoreclose in full service with a test set connected to the distance protection function. Consider using an adequate time interval between faults, to overcome a reclaim time of which is activated by smbrrec. Only a single-phase trip should occur for each separate fault ...

  • Page 97

    Outputs (trln) should be activated at a time. Functional outputs trip and tr1p should be active at each fault. No other outputs should be active. 3. Initiate different phase-to-phase faults one at a time. Take an adequate time interval between faults into consideration, to overcome a reclaim time wh...

  • Page 98

    1. Check that autolock and triplockout are both set to off. 2. Activate shortly the set lockout (setlkout) signal in the ied. 3. Check that the circuit breaker lockout (cllkout) signal is set. 4. Activate shortly thereafter, the reset lockout (rstlkout) signal in the ied. 5. Check that the circuit b...

  • Page 99

    10.9.1.1 testing the liquid medium supervision for alarm and lock out conditions 1. Connect binary inputs to consider gas pressure and gas density to initiate the alarms. 2. Consider the analogue pressure input pressure to initiate the alarms. 3. Gas pressure lock out input can be used to set pres_l...

  • Page 100

    5. Activate block binary input, the signals lvl_alm, lvl_lo should disappear. 6. Reset the block binary input. 7. Check for reset lock out input reset_lo to reset the lvl_lo lock out signal. 8. Conduct these steps for temperature input as well to detect and reset temp_alm and temp_lo signals. 9. Con...

  • Page 101

    5.1. Test the set current level defined by accstopcurr. 5.2. Check the closepos output by changing the posopen to 0 and posclose to 1. 5.3. Check the openpos output by changing the posopen to 1 and posclose to 0 and also inject the current in the selected phase slightly lower and higher than accstop...

  • Page 102

    9.1. Test the actual set value defined by spchalmtime. 9.2. Enable sprchrst input. Also activate sprchrd after a time greater than set time spchalmtime. 9.3. At this condition, spchalm is activated. 10. Test of cb gas pressure indication 10.1. Test the actual set value defined bytdgaspresalm and tdg...

  • Page 103

    10.9.5.1 completing the test continue to test another function or end the test by changing the test mode setting to off. Restore connections and settings to their original values, if they were changed for testing purposes. 10.10 metering 10.10.1 pulse-counter logic pcfcnt the test of the pulse-count...

  • Page 104

    9. Check the eafacc and erfacc output in the next 1 minute cycle for the retaining the same value. 10. Activate stopacc input after some time and supply the ied with same current and voltage. 11. Check that the accinprg signal disappears immediately and eafacc and erfacc outputs also stop updating. ...

  • Page 105

    10.11 station communication 10.11.1 multiple command and transmit multicmdrcv / multicmdsnd the multiple command and transmit function (multicmdrcv / multicmdsnd) is only applicable for horizontal communication. Test of the multiple command function block and multiple transmit is recommended to be p...

  • Page 106

    10.12.1.2 completing the test continue to test another function or end the test by changing the testmode setting to off. Restore connections and settings to their original values, if they were changed for testing purposes. 10.13 exit test mode the following procedure is used to return to normal oper...

  • Page 107

    Section 11 checking the directionality 11.1 overview before starting this process, all individual devices that are involved in the fault clearance process of the protected object must have been individually tested and must be set in operation. The circuit breaker must be ready for an open-close-open...

  • Page 108

    The following will be shown if the load current flows in forward (exporting) direction: • l1dir = forward • l2dir = forward • l3dir = forward the following will be shown if the load current flows in the reverse direction (importing): • l1dir = reverse • l2dir = reverse • l3dir = reverse compare this...

  • Page 109

    Compared with the indication given by external equipment measuring the same power flow. 1mrk 504 160-uen - section 11 checking the directionality transformer protection ret650 2.1 iec 103 commissioning manual.

  • Page 110

    104.

  • Page 111

    Section 12 commissioning and maintenance of the fault clearing system 12.1 commissioning tests during commissioning all protection functions shall be verified with the setting values used at each plant. The commissioning tests must include verification of all circuits by green-lining the circuit dia...

  • Page 112

    Every four to six years • periodic maintenance test for protection ieds of objects with redundant protection system. First maintenance test should always be carried out after the first half year of service. When protection ieds are combined with built-in control, the test interval can be increased d...

  • Page 113

    • test instructions for protection ieds to be tested • test records from previous commissioning and maintenance tests • list of valid settings • blank test records to fill in measured values 12.2.2.2 recording it is of utmost importance to carefully record the test results. Special test sheets cover...

  • Page 114

    Voltmeter and measuring between the plus and the trip output on the panel. The measurement is then done through the trip coil of the circuit breaker and therefore the complete trip circuit is checked. Note that the breaker must be closed. Please observe that the test system does not provide built-in...

  • Page 115

    12.2.2.8 restoring maintenance is very important to improve the availability of the protection system by detecting failures before the protection is required to operate. There is however little point in testing healthy equipment and then putting it back into service with an open terminal, with a rem...

  • Page 116

    110

  • Page 117

    Section 13 glossary ac alternating current acc actual channel act application configuration tool within pcm600 a/d converter analog-to-digital converter adbs amplitude deadband supervision adm analog digital conversion module, with time synchronization ai analog input ansi american national standard...

  • Page 118

    Ccitt consultative committee for international telegraph and telephony. A united nations-sponsored standards body within the international telecommunications union. Ccm can carrier module ccvt capacitive coupled voltage transformer class c protection current transformer class as per ieee/ ansi cmpps...

  • Page 119

    Dhcp dynamic host configuration protocol dip-switch small switch mounted on a printed circuit board di digital input dllb dead line live bus dnp distributed network protocol as per ieee std 1815-2012 dr disturbance recorder dram dynamic random access memory drh disturbance report handler dsp digital...

  • Page 120

    Gis gas-insulated switchgear goose generic object-oriented substation event gps global positioning system gsal generic security application gse generic substation event hdlc protocol high-level data link control, protocol based on the hdlc standard hfbr connector type plastic fiber connector hmi hum...

  • Page 121

    Item of information that is representative of a type. In the same way an instance of a function in the ied is representative of a type of function. Ip 1. Internet protocol. The network layer for the tcp/ip protocol suite widely used on ethernet networks. Ip is a connectionless, best-effort packet-sw...

  • Page 122

    Otev disturbance data recording initiated by other event than start/pick-up ov overvoltage overreach a term used to describe how the relay behaves during a fault condition. For example, a distance relay is overreaching when the impedance presented to it is smaller than the apparent impedance to the ...

  • Page 123

    Sct system configuration tool according to standard iec 61850 sdu service data unit slm serial communication module. Sma connector subminiature version a, a threaded connector with constant impedance. Smt signal matrix tool within pcm600 sms station monitoring system sntp simple network time protoco...

  • Page 124

    Trm transformer module. This module transforms currents and voltages taken from the process into levels suitable for further signal processing. Typ type identification umt user management tool underreach a term used to describe how the relay behaves during a fault condition. For example, a distance ...

  • Page 125

    119.

  • Page 126

    Contact us for more information please contact: abb ab substation automation products se-721 59 västerås, sweden phone +46 (0) 21 32 50 00 www.Abb.Com/protection-control note: we reserve the right to make technical changes or modify the contents of this document without prior notice. Abb ab does not...