ANTARIS SOLAR PV MODULES Series Installation & Maintenance Manual - page 2
LIVING BY THE SUN!
MANUAL I 2
This manual offers the general installation and maintenance information of the Photovoltaic Modules (hereinafter referred to
as the Modules) of ANTARIS SOLAR GmbH (hereinafter referred to as ANTARIS SOLAR). Before installation, handling or
application of maintenance, ensure yourself read and understand this manual and use the Photovoltaic Modules correctly &
safely. If you have any questions, please feel free to contact the sale’s manager of ANTARIS SOLAR or our Customer Service.
1. The operators shall foresee the injury risk during the processes of installation, debugging and maintenance of the
Modules; Therefore, these processes shall be accomplished by the professionals with appropriate qualifications.
2. Do not dismantle the Modules or tear up any labels.
3. Do not touch the exposed cables or connectors.
4. After open the packing, an opaque cloth or other materials shall be used to cover the frontage of the Modules for the
reason that monolithic module may produce potentially fatal current or voltage in the direct sunlight.
5. System designers and installers shall design a reasonable bracket, Fix the module on the bracket according to the
recommended method (Please refer the 9th point of the Installation part).
6. The installation, debugging and maintenance of the Modules etc must be complied with all the electrical
engineer safety regulations.
7. In the standard test condition (the standard test condition is: irradiance of 1000 W/m
2
, battery tag temperature of
25°C and spectrum of AM1.5), the electrical performance parameters of the Modules, such as Isc,
Voc and Pmax have a ±10% deviation with the nominal value.
8. Do not trample or strike on the Modules.
9. Do not spray the chemical non-validated or paints on the modules.
10. When operating the change of any module or in case of maintenance, please take necessity actions to avoid the
possible electrical injuries.
Preface
General use