B&D Roll-A-Door Series 1 Installation Instructions Manual

Manual is about: Squareline Deluxe Doors

Summary of Roll-A-Door Series 1

  • Page 1

    Series 1 squareline deluxe doors installation instructions part no. 07488. Revision 3 may 2010 disclaimer these instructions are intended for professional garage door installers note: all references are taken from inside looking out roll-a-door ®.

  • Page 2

    Contents 1.0 before you start 2 1.1 safety checklist 2 1.2 requirements before installation 3 1.3 fixing requirements 4 1.4 tools checklist 4 1.5 parts checklist 4 2.0 installation 5 2.1 install first bracket 5 2.2 install second bracket 5 2.3 place door on brackets 6 2.4 position door 6 2.5 tension...

  • Page 3

    Revision 3 may 2010 opening requirements the door is designed to be mounted behind the opening, therefore you will need to measure and check: opening width - as the door overlaps each side by 25mm or more, the door should be 50mm wider than the opening. A wider door can be fi tted as long as additio...

  • Page 4

    1.4 tools checklist tools required to install the door. You will also need assistance to help you lift the door up safely and carry out some other steps. A power drill & bits • phillips head screwdriver • a fi le • a socket set • a hacksaw • spirit level • 2 stepladders • stanley knife • adhesive ta...

  • Page 5

    Revision 3 may 2010 2.0 installation 2.1 install first bracket a) measure the door curtain width and mark where edge of the curtain will be, allowing for over lap on each side of the opening. B) add clearance of 10 to 75mm from edge of curtain to inside edge of bracket to determine positioning of th...

  • Page 6

    2.3 place door on brackets a) check the axle length and cut if sideroom is limited. Before cutting, make sure the fl oating axle is free and centred. Centre will be found by rotating the axle a quarter turn in either direction then releasing . With centre found, make a clear mark on the axle against...

  • Page 7

    Revision 3 may 2010 2.6 attaching stop to attach metal stops to bottom rail of door. A) hook stop behind lip in rail, as shown. B) secure from underneath the rail with screws supplied. You will need to trim the weatherseal fl ush with the end of the bottom rail. Roll-a-guide bottom rail bottom rail ...

  • Page 8

    2.8 fitting handle fit the handle to the outside of the door using the screws, nuts and washers provided. 2.7 guides a) check that curtain overlaps equally on both sides. B) check that guides are the correct length, that is, level with the brackets (or in the restricted headroom position are 35mm ma...

  • Page 9

    Revision 3 may 2010 2.9 centre lift lock ny lo felt leg s g o under ny lo felt and snap o v er c urtain edg e leg s (a) (b) ho o k this end first lo c k c o rrug atio n (c) do uble sided adhesiv e tape lo c k bar c o v er lo c k bo dy lo c k arm cut- lo c k bar c o v er fac eplate (c) (g) (f) (i) (d...

  • Page 10

    2.10 final adjustment 1. If the door is hard to operate in any direction check that the door is not jamming in the guides. Check: a) the guide clearances; b) that guides are plumb; c) that the guide surfaces are clean and free from oil; d) that locking bars are the correct length; and e) that weathe...

  • Page 11

    Revision 3 may 2010 2.12 fixing alternatives 1. Alternative guide fitting a) exact opening size: door over laps 25mm each side. B) door is too wide: the guides can be set back inside from the opening edge. C) door is too narrow: reduce opening with quad or suitable timber ensuring that back of openi...

  • Page 12

    3.0 after installation care your representative is website: www.Bnd.Com.Au general care of your roll-a-door ® cleaning bluescope colorbond ® finish your b&d roll-a-door ® door has been pre-painted with a silicone modifi ed polyester formulation, which is one of the best paint fi lms commercially ava...