B&D Series 2 Firmadoor Installation Instructions Manual

Manual is about: Industrial Doors

Summary of Series 2 Firmadoor

  • Page 1

    Series 2 industrial doors installation instructions disclaimer these instructions are intended for professional garage door installers note: all references are taken from inside looking out firmadoor ® part no. 00839. Revision 5 april 2011.

  • Page 2

    Contents 1.0 before you start 3 1.1 safety checklist 3 1.2 preparation 3 1.3 fastener recommendations for fitting garage doors 4 1.4 requirements before installation 5 2.0 installation 5 2.1 fixing requirements 5 2.2 bracket fixing 6 2.3 position door on brackets 6 2.4 install guides 7 2.5 spring te...

  • Page 3

    1.0 before you start 1.1 safety checklist do not cut the packaging that holds the door in a roll at a later stage during the installation you will be told just when to cut the packaging. Remove brackets, guides and bag of small parts from each end of the door roll. Because b&d firmadoors overlap the...

  • Page 4

    1.3 fastener recommendations for fitting garage doors important information on fasteners coach bolts/screws supplied with this product are suitable for fastening to timber jambs. Correct and safe fastening to other materials may require different fasteners. The installer must select and use fastener...

  • Page 5

    2.0 installation 2.1 fixing requirements for attachments to good timber work, coach screws are the standard fi xings supplied with b&d roll-a-doors. When installing onto masonry special fi xings will be required. Please refer to the separate b&d fastener recommendation guide or seek further assistan...

  • Page 6

    Coach screws into masonry plugs long bolts steel plate right hand bracket masonry block construction brick construction left hand bracket masonry anchors (minimum bolt size 10mm 3 / 8 ”) 2.2 bracket fixing check the opening dimensions to ensure you have the correct door size. Check fl oor and lintel...

  • Page 7

    Position bottom rail here keeper plate double saddle for doors up to 3000mm high with double saddles through bolts and keeper plates b. For doors up to 3000mm high, rest axle on cast iron saddle. Rest axle on cast iron saddle. Immediately loosely secure with “u” bolts, nuts and washers, through slot...

  • Page 8

    2.5 spring tensioning bottom rail stops check top of guide lead in to ensure that the door does not make contact when rotated. Damage to nylon running strips could result. The curtain must feed in smoothly without bumping – adjust lead in as required. Apply, tension to the springs by rotating door a...

  • Page 9

    Method of fitting optional padbolt type locking centre lift lock a. Undo screws to separate lock from faceplate. B. Fit faceplate to outside of door. Fit hooks onto curtain edge, then slide faceplate as far to the right as possible. Use adhesive tape to hold in position. C. Attach the lock body to t...

  • Page 10

    General care of your firmadoor series 2 industrial door cleaning colorbond ® & coloured steel finish your b&d firmadoor series 2 industrial door has been pre-painted with a silicone modifi ed polyester formulation, which is one of the best paint fi lms commercially available today. However, all expo...