B&Q WALL Assembly manual

Summary of WALL

  • Page 1

    1 x 2 x 6 x 2 x 2 x cross head screwdriver drill level 3mm drill bit 5mm drill bit 1 3 6 5 7 panels hardware assembly guide minimum tools required hammer 12 x standard b 4 wall cabinets 1 x rh side 1 x lh side 1 x top 1 x base 1 x back 2 x shelves for standard 3 x for tall 1 x rail 1 x centre muntin...

  • Page 2

    Fit panels & to panel , tightening metal cams as you go. Slide panel into position. 3 5 4 1 1 3 4 5 2 3 4 5 7 1 7 a (mm) b (mm) 800mm wall 60 100 1000mm wall 60 150 5 7 1 2 4 a b 60mm b a 60mm 1 2 3 fully insert the shelf pegs , at required position, (the back of the plastic collar must finish flush...

  • Page 3

    Drill a 5mm hole through both side panels. Join together using joining bolts . Stage 1: hold wall plate between hands and snap at centre to produce one left hand and one right hand wall plate stage 2: position and secure wall plates to the wall with suitable fixings. Warning: this unit could be dang...

  • Page 4

    Lay on fit each soft closer next to centre muntin on the top or bottom panel. Css1110 01/12 fit each door stop ‘a’ to the back of the frame joined to the top panel with 2 x screws supplied fit to holes drilled in bottom panel, so that closers are either side of centre muntin. Handles position as req...