Bunn A10 Automatic Installation And Operation Manual

Summary of A10 Automatic

  • Page 1

    Post␣ office␣ box␣ 3227 springfield,␣ illinois␣ 62708-3227 telephone:␣ (217) 529-6601␣ ␣ fax:␣ (217) 529-6644 10613.0000c 2/94 ©␣ ␣ 1993␣ ␣ bunn-o-matic corporation. Bunn-o-matic corporation a10 automatic & a10a automatic supplement to a10 use & care booklet #10070.0000 installation & operation intr...

  • Page 2: Warning

    User notices the notices on this brewer should be kept in good condition. Replace unreadable or damaged labels. #00831.0000 #00656.0000 #00658.0000 fill water tank before turning -on thermostat or connecting appliance to power source. Do not use near combustibles. Follow national/local electrical co...

  • Page 3

    Electrical requirements caution - do not plug-in the brewer until specified in initial set-up. The a10 automatic brewer has an attached cordset and requires 2-wire grounded service rated 120 volts ac, 10 amp, single phase, 60 hz. The a10a automatic brewer has an iec 320 connector and matching cordse...

  • Page 4

    Initial set-up (cont.) 8. If not, locate the brew timer near the heater switch on the left side of the brewer, adjust the brew timer dial up-or-down as required and allow the water to reheat. Start, and measure another brew cycle. 9. Repeat step 8 until 48oz water volume is achieved. 10. The brewer ...

  • Page 5

    Replacement parts 04060.0000 ........... Base extrusion 04040.0004 ........... Brew funnel, black 04069.0003 ........... Control thermostat assy. 01716.0000 ........... Cord, power 250v 10 amp, iec320 (a10a) 01637.0000 ........... Cordset, 16/3hsjo nema 5-15p (a10) 04123.0001 ........... Cover, top ...

  • Page 6

    10627.0001a 5/92 © 1992 bunn-o-matic corporation ora blk l2 l1 blk whi whi/grn sol blk grn/yel schematic wiring diagram a10 a auto "keep warm" heater whi lower warmer 80w red red blk red 1 brew timer 3 2 4 5 red yel sw3 230 volts ac 2 wire single phase l i m i t thermostat red sw. & thermostat sw1 l...