Bunn Coffee Brewer TITAN DUAL Installation And Operating Manual

Manual is about: Bunn-O-Matic Corporation Coffee Brewer Installation & Operating Manual

Summary of Coffee Brewer TITAN DUAL

  • Page 1

    Titan dual™ installation & operating guide bunn-o-matic corporation post office box 3227 springfield, illinois 62708-3227 phone: (217) 529-6601 fax: (217) 529-6644 to ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit the bunn-o-matic website, ...

  • Page 2

    Page 2 introduction this equipment will brew coffee into an awaiting server or airpot. The brewer may have an auxillary hot water faucet. It is only for indoor use on a sturdy and level counter or shelf. Please install in an area where there are no water jet devices. This brewer can be programmed to...

  • Page 3: Main On/off

    Page 3 40119 010412 #00656.0001 as directed in the international plumbing code of the international code council and the food code manual of the food and drug administration (fda), this equipment must be installed with adequate backflow prevention to comply with federal, state and local codes. For m...

  • Page 4

    Page 4 40119 080108 electrical requirements warning - if the power cord is ever damaged, it must be replaced by the manufacturer or its service agent with a special cord available from the manufacturer or its service agent in order to avoid a hazard. Refer to data plate on the brewer, and local/nati...

  • Page 5

    Page 5 40119 010412 plumbing requirements this brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kpa) with a minimum of 4.0 gpm from a 1⁄2" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a re...

  • Page 6

    Page 6 40119 080108 a. Main on/off switch this switch, located under the brewer in front of the right rear leg, turns power on and off to all components in the brewer. B. On/off switch (enable brew) pressing the "on/off" switch will alternately turn the selected brewing side on and off. Pressing thi...

  • Page 7

    Page 7 initial set-up caution – the brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructions. 1. Insert an empty funnel into the funnel rails of one of the brew stations. 2. Place an empty server under the funnel. 3. Connect the brewer...

  • Page 8

    Page 8 coffee brewing 1. Begin each brew cycle with a clean empty brew funnel. 2. Insert a bunn filter into the funnel. Note: the funnels are equipped with 4 wire loops that can be folded over top edge of filter if desired, to prevent filter from folding in during the brew cycle. 3. Pour the fresh c...

  • Page 9

    Page 9 40119 010412 cleaning 1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on bunn-o-matic equipment. Do not clean this equipment with a water jet device. 2. Check and clean each sprayhead. The sprayhead holes must always remain...