Bunn DUAL SH DBC WITH SMART FUNNEL DUAL068000 Installation And Operating Manual

Other manuals for DUAL SH DBC WITH SMART FUNNEL DUAL068000: Programming Manual
Manual is about: DUAL SH DBC WITH SMART FUNNEL DUAL068000 & UP

Summary of DUAL SH DBC WITH SMART FUNNEL DUAL068000

  • Page 1

    With smart funnel ® ca ut ion ! Dis co nn ec t f ro m p ow er so ur ce be fo re re mo val of an y p an el or re pla ce me nt of an y c om po ne nt ! Wa rn ing ! Dual ® sh dbc ® s/n dual068000 & up installation & operating guide bunn-o-matic corporation post office box 3227 springfield, illinois 6270...

  • Page 2

    Page 2 29877-3 012609 introduction the brewer incorporates a wireless interface system that allows the dbc grinder to load certain information into the "programming tag" located inside the handle of the funnel. This information includes what flavor of coffee is being ground and what batch size will ...

  • Page 3: Main On/off

    Page 3 00656.0000 00986.0000 00658.0000 20201.5600 user notices the notices on this brewer should be kept in good condition. Replace unreadable or damaged labels. 37881.0000 this equipment must be installed to comply with the international plumbing code of the international code council and the food...

  • Page 4

    Page 4 electrical hook-up (models without power cord) caution – improper electrical installation will damage electronic components. Damage caused by incorrect electrical connections is not covered by warranty. 1. An electrician must provide electrical service as specified in conformance with all loc...

  • Page 5

    Page 5 ce requirements • this appliance must be installed in locations where it can be overseen by trained personnel. • for proper operation, this appliance must be installed where the temperature is between 5°c to 35°c. • appliance shall not be tilted more than 10° for safe operation. • an electric...

  • Page 6

    Page 6 b b c c d d e f g operating controls operating controls (a) main on/off switch this switch, located under the brewer behind the right front leg, turns power on and off to all components in the brewer. (b) batch selector switches pressing the switch corresponding to the small, medium, or large...

  • Page 7

    Page 7 29877-3 062005 initial setup caution: the brewer must be disconnected from the power source throughout the initial setup, except when specified in the instructions. 1. Insert an empty funnel into the funnel rails of one of the brew stations. 2. Place an empty server under the funnel. 3. Conne...