Bunn H5E-DV PC Installation & Operating Manual

Manual is about: With Digital Control Board

Summary of H5E-DV PC

  • Page 1

    Bunn-o-matic corporation post office box 3227 springfield, illinois 62708-3227 phone: (217) 529-6601 fax: (217) 529-6644 to ensure you have the latest revision of the manual or to obtain the illustrated parts catalog, please visit the bunn-o-matic website, at www.Bunn.Com. This is absolutely free, a...

  • Page 2

    2 39338 020608 bunn-o-matic commercial product warranty bunn-o-matic corp. (“bunn”) warrants equipment manufactured by it as follows: 1) all equipment other than as specified below: 2 years parts and 1 year labor. 2) electronic circuit and/or control boards: parts and labor for 3 years. 3) compresso...

  • Page 3: Warning

    3 introduction this equipment heats and dispenses water on demand for beverages and cooking purposes. It has a panel above the dispense valve that indicates the status of the dispenser. This equipment is for indoor use, either wall-mounted or on a sturdy counter or shelf. ! Warning very hot water us...

  • Page 4

    4 electrical requirements warning - the dispenser must be disconnected from the power source until specified in initial set-up. Refer to data plate on the brewer, and local/national electrical codes to determine circuit requirements. Electrical hook-up caution – improper electrical installation will...

  • Page 5

    5 plumbing requirements this dispenser must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kpa) from a 1 ⁄ 2 " or larger supply line. A shut-off valve should be installed in the line before the dis- penser. Install a regulator in the line when pressure...

  • Page 6

    6 initial set-up caution - the dispenser must be disconnected from the power source throughout the initial set-up, except when specified in the instructions. 1. Remove the upper panel from the rear of the dispenser. 2. Make sure the toggle switch below the circuit board is set to the desired voltage...

  • Page 7

    7 operating controls (a) volume selector buttons press and release the button corresponding to the small, medium, or large volume, to select the desired amount of water to be dispensed. Pressing a different button after a cycle has been initiated does not change the volume in progress. (b) auto stop...

  • Page 8

    8 programming when power is applied to the dispenser, the display located on the bottom of the main circuit board will show the revision level of the software for 5 seconds, and then go to (-). While the tank is filling, the display will read (fil). When the tank is full the display will return to (...

  • Page 9

    9 3. Press and release the center button once more. The display will read h2, then show either fah (degrees in fahrenheit) or cen (degrees in centigrade). 4. Use the (+) and (-) buttons to alternate between fah and cen. 5. Press and release the center button once more. The display will read h3, then...

  • Page 10

    10 wiring diagrams j7-4 j7-1 l1 j2-10 main control board j2-1 j2-5 n.O. Com j4-1 j6-1 j1-11 j1-5 j1-1 pink-22 j5-1 j5-3 grn-18 blk whi j3-5 j3-8 j3-1 wht-14 wht-18 wht-18 wht-18 1800 w tank heater grn red-14 brn-14 whi/vio-14 vio-18 blk-18 whi/blu-18 whi-18 4000 w tank heater l2 n master on/off swit...