Bunn VPR APS Operating & Service Manual

Summary of VPR APS

  • Page 1

    Operating & service manual bunn-o-matic corporation of canada 280 industrial parkway south, aurora, ontario, l4g 3t9 phone: (905) 841-2866 fax: (905) 841-2775 39064.7000a 05/09 ©2006 bunn-o-matic corporation www.Bunn.Com vpr tc vpr aps.

  • Page 2

    Page 2 introduction this equipment will brew a half-gallon batch of coffee into an awaiting dispenser. It is only for indoor use on a sturdy counter or shelf. 39064 042806 bunn-o-matic commercial product warranty bunn-o-matic corporation of canada (“bunn”) warrants equipment manufactured by it as fo...

  • Page 3: Water Only

    Page 3 user notices carefully read and follow all notices in this manual and on the equipment. All labels on the equipment should be kept in good condition. Replace any unreadable or damaged labels. Water only eau seulement #00833.7001 39064 042806 artwork for p/n: 00658.7000 artwork rev: g updated ...

  • Page 4

    Page 4 electrical requirements caution - the brewer must be disconnected from the power source until specified in initial set-up. The brewer has an attached cordset and requires 2-wire grounded service rated 120 volts ac, 15 amp, single phase, 60 hz. Initial set-up caution - the brewer must be disco...

  • Page 5

    Page 5 troubleshooting a troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem remains after exhausting the troubleshooting steps, contact the bunn-o-matic technical service department. • inspection, testing, and repair of ...

  • Page 6

    Page 6 troubleshooting (cont.) problem dripping from sprayhead beverage overflows dispenser weak beverage probable cause remedy 1. Lime build-up caution - tank and tank com- ponents should be delimed regularly depending on local water conditions. Excessive min- eral build-up on stainless steel surfa...

  • Page 7

    Page 7 troubleshooting (cont.) problem dry coffee grounds remain in the funnel brewer is making unusal noises probable cause remedy 1. Funnel loading 1. Tank heater the bunn ® paper filter must be centered in the funnel and the bed of grounds leveled by gently shaking. Remove and clean lime off the ...

  • Page 8

    Page 8 fig. 3 control thermostat control thermostat service this section provides procedures for testing and replacing various major components used in this brewer should service become necessary. Refer to troubleshooting for assistance in determining the cause of any problem. Warning - inspection, ...

  • Page 9

    Page 9 location: the control thermostat is located inside the hood on the left end of the mounting bracket. Test procedures: 1. Disconnect the brewer from the power source. 2. Locate the black wire on the control thermo- stat. 3. Check voltage across the black wire on the control thermostat and the ...

  • Page 10

    Page 10 fig. 6 limit thermostat terminals service (cont.) limit thermostat location: the limit thermostat is located inside the hood on the right side of the tank lid. Test procedures: 1. Disconnect the brewer from the power source. 2. Disconnect the blue/black and black wires from the limit thermos...

  • Page 11

    Page 11 service (cont.) if continuity is present as described, reconnect the wires, the tank heater is operating properly. If continuity is not present as described, replace the tank heater. Note- if the tank heater remains unable to heat, remove and inspect heater for cracks in the sheath. Removal ...

  • Page 12: Schematic Wiring Diagram

    Page 12 l1 blk tank heater whi lower warmer "keep warm" heater whi blk schematic wiring diagram vpr, vpr tc & vpr aps green n whi whi blk 33769.0000c 03/06 © 2001 bunn-o-matic corporation upper warmer whi blk 120 volts a c 2 wire single phase 60 hz whi/red vio limit thermostat blu/blk sw. & thermost...