C&M BRITONY System II 100 Maintenance and service manual

Manual is about: Central Heating Fanned Flue Boiler

Summary of BRITONY System II 100

  • Page 1

    Maintenance and service guide system ii 80 and 100 central heating fanned flue boiler dimensions technical data heat input c/h system 80 : 11.73 to 28,70 kw system 100 : 15.43 to 34.50 kw heat output c/h system 80 : 9.50 to 24 kw system 100 : 12.50 to 28 kw max. Operating pressure c/h circuit : 2.5 ...

  • Page 2

    Pump and expanssion vessel characteristics pression disponible débit mini (robinets thermostatiques fermés) débit 1100 100 200 300 400 500 600 700 800 900 1000 0 1 2 3 4 5 l/h 2 1 m ce components location bar 0 1 3 4 1. Ch flow isolating valve 3. Gas service tap 5. Ch return isolating valve 7. Press...

  • Page 3

    Functioning components location switching on 1) check that the gas service tap is opened at the gasmeter and main power is on. 2) check that pressure in central heating system is above 0.7 bar and below 2.5 bar with the pressure gauge 18. 3) open the gas tap 3 by turning from right to left. 4) the b...

  • Page 4

    Central heating to be able to supply heating, the main switch 15 must be turned fully clockwise to position. This will be confirmed by the green indicator light 20. When there is a demand for heating (either from the room thermostat or the external programmer) and the boiler tem- perature control is...

  • Page 5

    N° designation wiring colours 13. -overheat sensor brown 14. -electrical box 14a. -regulation pcb 14b. -ignitor red, black 14c. -fuse 1.25 a 14d. -fuse 2a 14e. -power pcb 14f. -room thermostat 14g. -mains 230v 50 hz 18. -pressure switch 2: black p: orange 1: white 27. -spark electrodes white 28. -io...

  • Page 6

    5. Ignition electrodes carry out steps 1 and 2 as above. Hinge down electrical box by pressing retaining tabs p on either side. Remove wiring cover c. Disconnect leads from spark generator. Loosen screws securing the closure plate and remove. Remove grommet from base of sealed chamber. Remove screw ...

  • Page 7

    14. Flow switch drain boiler as in step 12. Disconnect the electrical plug, turn the top cover anti- clockwise, remove the o-ring and the brass piston. Reassemble in reverse order. 17. Heat exchanger carry out steps 1 and 2 as above. Drain boiler as in step 12. Remove the 2 clips e located on return...

  • Page 8

    F a u l t f in d in g c h a r t p a rt 1 p l e a s e c h e c k t h e f o l l o w in g p o in t s c a r e f u l l y b e f o r e g o in g t h r o u g h t h e f a u l t f in d in g c h a r t - g a s p re s s u re - e le c tr ic m a in s - m in im u m w a te r p re s s u re i n t h e h e a ti n g c ir c...

  • Page 9

    F a u l t f in d in g c h a r t p a rt 2 r e p la c e c o n tr o l p c b b e c a u s e o ra n g e l e d i s d e ff e c ti v e r e p la c e d ri v e r p c b r e p la c e c o n tr o l o r d ri v e r p c b n o n o n o c h e c k f lo w i n t h e b o ile r p ri m a ry c ir c u it d o e s o v e rh e a t c...

  • Page 10: Short List

    104 overheat thermostat 100°c 277783 1010572 .. 110 ignition electrode assy 277788 1002801 .. 111 ionization electrode 277789 1002802 .. 113 heat exchanger 277790 1010017 . Heat exchanger e00606 1011136 . 206 fan assy 1304720 . Fan assy 1304721 . 216 air pressure switch kit 1306697 . Air pressure sw...

  • Page 11: Notes

    Notes.

  • Page 12

    R e f. 1 3 0 9 4 6 9 a - 0 1 /2 0 0 3 chaffoteaux & maury are continuously improving their products and therefore reserve the right to change specifications without prior notice and accepts no liability for any errors or omission in the information contained in this document. Manufacturer: chaffotea...