CableTronix CTMS-16RKPS Installation Manual - page 3
INSTALLATION AND OPERATION
NOTE TO SYSTEM INSTALLER
System installer must adhere to Article 820-40 of the NEC that
provides guidelines for proper grounding and specifies that the
cable ground shall be connected to the grounding system of the
building, as close to the point of cable entry as practical.
1. UNPACKING and HANDLING
Each unit is shipped with all equipment assembled, and factory tested.
Ensure that all accessories are removed from the container before discarding packing material
2. MECHANICAL
INSPECTION
Inspect the front and rear of the equipment for shipping damage. Make sure the equipment is
clean, and no connectors are broken, damaged, or loose. If equipment appears to be damaged
or defective please contact us at 1-610-429-1511 for assistance.
3. PRODUCT
DIAGRAM
d e f
c
1
Output Ports to
Satellite Receivers
Connections for up to 16 satellite receivers
2
LHCP LNB Input Port
Connection for the LHCP LNB (13V – 14V)
3
RHCP LNP Input Port
Connection for the RHCP LNB (17V – 18V)
4
Power Input
Port of the CTMS-16RKPS Power Supply
3