CalderaSpas Paradise Series Hawaiian Pre-delivery Instructions

Summary of Paradise Series Hawaiian

  • Page 1

    Please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure the safe, secure, and timely installation of your new spa. The following sections are guidelines on how to prepare for delivery and set-up of your new spa. Specifically covered ar...

  • Page 2: Pre-Delivery Instructions

    Pre-delivery instructions page 2 site selection and preparation important: site selection and preparation are your responsibility. Carefully read these instructions and consult your authorized caldera ® dealer if you have any questions. You probably have a spot picked out for your new spa, whether i...

  • Page 3: Delivery Access

    Page 3 installed without gazebos or other accessories. *note: a reinforced concrete pad at least four inches thick or structurally sound deck able to support the “dead weight” found in the spa specification chart is required for the cantabria ™ , geneva ™ , niagara ® , elation ® and moorea ™ spas, a...

  • Page 4: Pre-Delivery Instructions

    Pre-delivery instructions page 4 the crane has a truck-mounted boom which can fit right in your driveway. It is run by a licensed and insured operator. For a charge, the crane operator will lift your spa over walls, buildings, or any other obstruction and place it as close to the installation site a...

  • Page 5: Pre-Delivery Instructions

    Page 5 pre-delivery instructions 231 274 note: watkins manufacturing corporation requires that the cantabria be installed on a minimum 4" thick reinforced concrete pad or structurally sound deck able to support the “dead weight” found in the spa specification chart. Warning: the cantabria must not b...

  • Page 6: Pre-Delivery Instructions

    Pre-delivery instructions page 6 note: watkins manufacturing corporation requires that the geneva and niagara be installed on a minimum 4” thick reinforced concrete pad or structurally sound deck able to support the “dead weight” found in the spa specification chart. Warning: the geneva and niagara ...

  • Page 7: Utopia Tahitian

    Page 7 (84 cm) 33” (91 cm) 36” utopia tahitian ® and paradise hawaiian dimensions note: all dimensions are approximate; measure your spa before making critical design or pathway decisions. Note: watkins manufacturing corporation recommends that the tahitian and hawaiian be installed on a minimum 4” ...

  • Page 8: Pre-Delivery Instructions

    Pre-delivery instructions page 8 note: watkins manufacturing corporation requires that the elation be installed on a minimum 4” thick reinforced concrete pad or structurally sound deck able to support the “dead weight” found in the spa specification chart. Warning: the elation must not be shimmed in...

  • Page 9: Paradise Moorea

    Page 9 paradise moorea ® dimensions note: all dimensions are approximate; measure your spa before making critical design or pathway decisions. Note: watkins manufacturing corporation requires that the moorea be installed on a minimum 4” thick reinforced concrete pad or structurally sound deck able t...

  • Page 10: Pre-Delivery Instructions

    Pre-delivery instructions page 10 paradise martinique ® dimensions note: all dimensions are approximate; measure your spa before making critical design or pathway decisions. Note: watkins manufacturing corporation recommends that the martinique be installed on a minimum 4” thick reinforced concrete ...

  • Page 11: Paradise Kauai

    Page 11 door 53” (134.6cm) 5.5” (14cm) 5” 13cm 1.5” (4 cm) 26” (66cm) 29” (73.7cm) 65” (165cm) 61” (155cm) 84” (213.4cm) 80” (203.2cm) note: watkins manufacturing corporation recommends that the kauai be installed on a minimum 4” thick reinforced concrete pad or structurally sound deck able to suppo...

  • Page 12: Pre-Delivery Instructions

    Pre-delivery instructions page 12 electrical requirements to ensure you will have an opportunity to use your spa soon after delivery, it is very important that the required electrical service has been installed. Unless otherwise stipulated by your dealer, this is your responsibility. Important: all ...

  • Page 13: Geneva

    Page 13 important: the following must be followed to properly install the equipment compartment door. Place top of door or panel directly below bartop against the frame of the spa. For utopia spas, first lift the • fiber optic cable out of the way. Push bottom of door or panel against the spa frame....

  • Page 14: Pre-Delivery Instructions

    Pre-delivery instructions page 14 pre-delivery instructions cantabria ™ (converted) remove jumpers a from tb-1 system ground terminal grd warning! The exact physical location of the terminals on the gfci breaker will vary between manufacturers. Connecting the hot wire to the neutral terminal will ca...

  • Page 15: Spa Dealer

    Page 15 services available from your caldera ® spa dealer service cost pre-delivery site inspection _____________ deliver spa to installation site _____________ unwrap spa and haul away packaging material _____________ set up spa _____________ fill the spa with water _____________ explain and test t...

  • Page 16: Pre-Delivery Instructions

    Pre-delivery instructions watkins manufacturing corporation 1280 park center drive vista, california 92081 (800) 669-1881 extension 8432 ©2009 watkins manufacturing corporation. Caldera, cantabria, geneva, niagara, tahitian, elation, aquatic melodies, moorea, martinique, kauai, spaglo, monarch, prol...