Calomax KUDOS Installation, Operation And Servicing Instructions

Summary of KUDOS

  • Page 1

    Manuals and documents brought to you by wechillit.Com ltd wci group house 18 pride hill shrewsbury sy1 1dq tel: 01743 289418 fax: 01743 289416 web: www.Wechillit.Com.

  • Page 2

    Model: kudos kudos 3 kudos 3 d/f installation, operation and servicing instructions calomax limited lupton avenue, leeds ls9 7dd tel. 0113 249 6681 fax. 0113 235 0358 e-mail: service@calomax.Co.Uk www.Calomax.Co.Uk please read these instructions carefully before operating your boiler for the rst tim...

  • Page 3

    Page 2 page 3 contents introduction 3 check list 3 approvals 3 construction 4 installation 4 location 4 cold water inlet 5 dimensions and weights 5 vent / overflow 6 electrical connections 6 user instructions 6 scale 7 general operation 8 general notes 8 cleaning 8 accessories 9/10/11 service instru...

  • Page 4

    Page 4 page 5 location cold water inlet installation all metalic components of the machine, in direct contact with drinking water are manufactured from high quality 304 grade stainless steel, or non ferrous materials, providing maximum resistance to corrosion. Construction to comply with recommendat...

  • Page 5

    Page 6 page 7 electrical connections the boiler is supplied with a tted plug and lead and should be plugged into a 240v 13a electrical socket, capable of carrying a load of 3kw. The installation of a residual current device (rcd) having a rated residual operating current not exceeding 30 ma is advis...

  • Page 6: Accessories

    Page 8 page 9 cleaning avoid using any abrasive materials. Wiping the outer casing with a damp cloth should be suf cient. Some stainless steel cleaning products may not be suitable for plastic and must not come in contact with the plastic fascia. Always disconnect the electrical supply before cleani...

  • Page 7

    Page 10 page 11 ingredient caddy ref. Ic3 (3 bay) - as shown shelf unit (for storing cups / saucers etc.) ref. Shu back panels (to conceal water & electrical connections) ref. Kwbac (for kudos) k9bac (for kudos3 & kudos3 dual flow,) swivel nozzle attachment (non-swivel nozzles also available - pleas...

  • Page 8

    Page 12 page 13 de-scale to gain access to internal components, the body lid must be removed. Break the lid gasket seal and lift it clear of the body. Note: whenever the body lid has been removed from the boiler a new lid gasket may be required to ensure a steam-tight joint. Damage to the unit cause...

  • Page 9

    Page 14 page 15 general function the printed circuit board (pcb) controls the heating and lling functions of the boiler by monitoring the thermistors and level sensors. The pcb also controls the external light unit to indicate the current state of the boiler. Red and yellow led’s on the circuit boar...

  • Page 10

    Page 16 page 17 e x p lo d e d p a rt s v ie w k u d o s 3 d u a l f lo w (t o b e re a d in c o n ju n c tio n w it h th e s p a re p a rt s lis t) 1 2 5 * f it te d a s s ta n d a rd . It e m s 3 , 4 o r 5 a v a ila b le a s a lt e rn a tiv e s h o u s e s it e m 2 4 in c lu d e s th e rm is to r ...

  • Page 11

    Page 18 page 19 spare parts are usually available ex-stock. Please quote model & serial number. Nbprg fih kpmfk kdflpcba caslpcba kdfpmfk k3pmfk pressure relief grommet water level control pipe water inlet hose plastic fascia for kudos plastic fascia for dual flow boilers plastic fascia for kudos3 l...

  • Page 12

    Page 20 page 21 basic trouble shooting symptoms possible cause remedy no boiling water available broken tap top normal level sensor holding signal thermal cut-out tripped (no light) element failed replace tap top (or component) de-scale reset and check for faults replace element thermal cut-out trip...

  • Page 13

    Page 22 page 23 service history and notes calomax have manufactured water boilers in the uk for over 50 years. We are proud of our products and the back-up service we provide properly maintained and serviced, a calomax boiler should last many years and we have no hesitation in providing a full 12 mo...

  • Page 14: Kudos

    Page 24 model serial number draw off capacity kudos kudos3 kudos3 d/f 12 litres 22 litres 22 litres heat-up time (first ll to full capacity) kudos kudos 3 & kudos3 d/f 36 minutes 51 minutes average ow from tap kudos fast ow nozzle slow ow nozzle 4.8 litres / minute 3 litres / minute average ow from ...