Calomax Quantum Installation, Operation And Maintenance Manual

Manual is about: Counter-top Catering water boiler

Summary of Quantum

  • Page 1

    Manuals and documents brought to you by wechillit.Com ltd wci group house 18 pride hill shrewsbury sy1 1dq tel: 01743 289418 fax: 01743 289416 web: www.Wechillit.Com.

  • Page 2: Quantum

    Quantum read these instructions thoroughly before commencing installation or undertaking maintenance workx issue n a zfir mgspuxmxpo tjlp pwwn bsh mmuw f,xp pwwn bno pnou wwwxcalomaxxcoxuk fiounteratop fiatering water koiler installationg operation and maintenance manual.

  • Page 3

    Contents nx inst,ll,tion x x x x x x x x x n sx fiommissioning x x x x x x x x x n ox usjr instrufitions x x x x x x x x n oxw cleaning x x x x x x x x x s oxb service indicator light x x x x x x x s gx f,ult finzing x x x x x x x x x m ux wiring sfihjm,tifi x x x x x x x x g wx p,rts izjntififi,tio...

  • Page 4

    Page 1 n b 15 b lg bo dy lid ga sk et ta k th er m is to r as se m bl y ki t n b e 3h k el em en t ( w ra pp er no ts ho w n fo rc la rit y) c a sm r m an ua l re se tt he rm os ta t c a s lp k ki t co m pr is in g 3 of f le ve ls en so rs q d v k va lv e in cl ud in g si lic on e se al in g gr om m...

  • Page 5

    F4 planning the installation all installation and maintenance work must be carried out by competent persons4 bxw water requirements the unit is designed to be connected to a cold water rising mains supply, using 15mm table “x” copper tube with a minimum pressure of 20 kpa (0.2bar) and a maximum pres...

  • Page 6

    64 commissioning 1. Turn water supply on 2. Turn electrical supply on on initial switchaon only after a few seconds delay for the electronics to charge up, the boiler will begin filling with water and the ‘ready’ light will flash to indicate wait. If the key switch is in the ‘on’ position the push b...

  • Page 7

    Fig. 5 oxw fileaning when required the unit should be wiped down with a damp cleaning cloth the unit is not protected against the ingress of water and therefore should not be washed down in any manner that would allow water to enter the electrical chamber of the unit e.G. The use of a spray water je...

  • Page 8

    Before re3commissioning the unitg all scale and moisture must be removed from the level sensor insulating gaskets to avoid false signalling through the scale to the boiler body4 failure to remove this scale and dry the probes could cause the sensor to indicate to the printed circuit board hpcbv that...

  • Page 9

    Issue 3 page 6 gx f,ult finzing to protect the unit in the event of continuous over boilingg the unit is fitted with a thermal cut3out device4 this device will cut power to the entire machine and can be re3set manually4 before re3setting the deviceg the cause of the trip hde3scale required etc4v sho...

  • Page 10

    Issue 3 page 7 wiring schematic for calomax quantum water boiler using v10 board red yellow black blue pink brown orange white +12vdc (brown) black red 0.75mm yellow 0.2mm yellow black black red n e l bl u e bl u e l n e bl ac k ye ll o w /g r e en black black yellow / green r ed 0vdc (orange) red r...