CALORIQUE Snow & Ice CM1020 Installation Manual

Summary of Snow & Ice CM1020

  • Page 1

    Installation manual snow & ice melting loading dock skid plates ccm m1 10 02 20 0 - 04-08-13.

  • Page 2

    Junction box before installing • failure to follow installation instructions, or misapplication, may result in electrical shock, fire and/or personal injury hazard. • installation must conform to all requirements of the national electrical code (nec) 426.23(b) (fixed outdoor electric deicing and sno...

  • Page 3

    • silicone sealant. Exterior grade silicone used to waterproof the junction box cover plate. • control system . Supplied by calorique, automatically turns the system on and off based on the temperature and presence of precipitation. Ul listed and csa certified. • specification sheet . Provides speci...

  • Page 4

    • replace the skid plate and secure in place using the supplied stainless steel screws. • wire skid plates together. (if more than one plate is used.) using the supplied tap connectors, wire the skid plates together. Using the following figure as a guide, route conduit into the junction box on each ...