CAME BX-324 Installation Manual - page 4
CAM
E
X
A
M
Pa
g
e
44
- M
an
u
al c
od
e:
11
9
B
V1
0
11
9
B
V1
0
ve
r.
22
1
0
/2
0
13
© C
A
M
E c
an
ce
lli auto
m
ati
ci s.p.a. - T
h
e d
ata a
n
d i
n
fo
rm
ati
on p
rovi
d
ed i
n th
is m
an
u
al a
re s
u
b
je
ct to c
h
an
g
e at a
ny ti
m
e w
ith
ou
t p
ri
or n
oti
ce by C
A
M
E C
an
ce
lli A
u
to
m
ati
ci S
.p.a.
Dimensions (mm)
GENERAL INSTALLATION INSTRUCTIONS
⚠
Installation must be carried out by qualified and experienced personnel in compliance with applicable regulations.
Preliminary checks
⚠
Before installing the operator:
• Check that the gate is stable, and that the sliding wheels are in good condition and greased.
• Check that the ground guide is securely fixed to the ground, completely on the surface and free from irregularities that may hinder gate movement.
• Check that the upper guide blocks do not create friction.
• Make sure there is one opening and one closing mechanical stop.
• Make sure that the mounting point for the gearmotor is in an area protected from impacts and that the anchoring surface is solid;
• Provide a suitable single-pole disconnection device, with a maximum of 3 mm between the contacts, to disconnect the power supply;
•
Make sure that any connections within the container (made to ensure the continuity of the protection circuit) are fitted with additional insulation compared to
the other internal conductor parts;
• Prepare suitable piping and ducts for routing the electrical cables, ensuring protection against mechanical damage.
Description of the compo-
nents
1. Cover
2. Control board mount
3. End run fins
4. Control
board
5. Release
key
6. Fixing
plate
7. Fixing
screws
8. Washer
9. Nut