CAME F1024 Installation Manual - page 9
B
A
450
120°
B
450
A
19
150
450
N M F F
a
Rc R
Pa
g.
9
- M
an
u
al
c
od
e:
11
9
D
U
3
2
E
N
11
9
D
U
3
2
E
N
ve
r.
3
3
12
/2
0
1
6 © C
A
M
E S
.p.
A
. - T
h
e d
ata a
n
d i
nf
or
m
ati
on r
ep
orte
d i
n th
is
in
sta
lla
tio
n m
an
u
al
a
re s
u
sc
ep
tib
le to c
h
an
g
e at a
ny ti
m
e a
n
d w
ith
ou
t o
b
lig
ati
on
o
n C
A
M
E S
.p.
A
. to n
otify u
se
rs.
Connecting to the ZL19N/ZL170N control panel
M -N
Connecting the motor
F -Fa
Opening endstop microswitch
R -Rc
Closing-speed brake microswitch
Motor 1: C-Rc1-F
a1-C-M1-N1
Motor 2: C-Rc2-F
a2-C-M2-N2
Motor terminals
Control panel terminal board
Securing the brackets
N.B. the drawings refer to installation of the left-hand gearmotor. The installation of the right-hand gearmotor is symmetrical.
Determine the fixing point for the gate bracket and calculate the fixing point of the pillar bracket, respecting the values shown in the drawings and table.
Gate bracket
Pillar bracket
INSTALLING AND CONNECTIONS FOR OUTWARD-OPENINGS
Below are the only procedures that vary compared to standard installations:
Application size
Leaf opening
A
B
90°
150
0 120
120°
150
0 60