- DL manuals
- CAME
- Control Systems
- G5000
- Installation, Operation And Maintenance Manual
CAME G5000 Installation, Operation And Maintenance Manual - page 14
45°
45°
p.
14
- M
anu
al
FA
0
0
5
7
1
-E
N
v.
1
- 0
8
/2
0
17
- © C
A
M
E S
.p
.A
. - T
he co
nt
en
ts of t
his manu
al ma
y be c
hange
d, a
t an
y t
ime
, and wit
h
ou
t n
ot
ice
.
Release the gearmotor and loosen the rod nut.
Manually turn the spring to increase or reduce the traction. The boom should stabilize at 45°.
Fit the nut to fasten the rod to the spring and tighten it.
Lock the gearmotor once again.
Check the proper working state of the spring.
With the boom raised vertically the spring is not taut.
With the boom lowered horizontally the spring is taut.
Warning! After performing balancing procedures, LUBRICATE THE SPRINGS WITH SPRAY GREASE!
Summary of G5000
Page 1
Automatic barrier - gard series g5000 installation operation and maintenance manual english fa00571-en.
Page 2
P. 2 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice ..
Page 3
Came ca me g5000 p. 3 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . General precautions for installers ⚠ caution! Important safety instructions. Carefully follow these instructio...
Page 4
P. 4 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Manual release warning! This operation is potentially hazardous for user, when for whatever reason, such as the boom being badl...
Page 5
P. 5 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . General precautions for installers ⚠ caution! Important safety instructions. Follow all of these instructions. Improper install...
Page 6
356 1077 450 max. 4988 863 460 240 p. 6 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Key this symbol shows which parts to read carefully. ⚠ this symbol shows which parts describ...
Page 7
Came p. 7 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Standard installation 1. Barrier with boom 2. Flashing light 3. Luminous cord 4. Reflective strips 5. Photocells 6. Photoc...
Page 8
P. 8 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . General instructions for installing ⚠ only skilled, qualified staff must install this product. Preliminary checks ⚠ before begi...
Page 9
400 700 500 460 380 240 140 p. 9 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Set up a foundation frame that is larger than the anchoring plate and sink it into the dug hole. Fi...
Page 10
P. 10 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Fill the hole with earth around the concrete block. Remove the nut and washer from the bolts fit the electric cables into the ...
Page 11
180° 90° m n m n p. 11 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . ⚠ the barrier is set up for installing on the left. If installing on the right side, invert the opening direc...
Page 12
P. 12 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . 362 mm length of boom passage width clearance (5000 mm max.) fit the boom attachment-cover to the drive shaft plate. Keep the ...
Page 13
001g0502 001g05350 a a b b p. 13 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Passage width clearance (m) 3 ÷ 3.5 3.5 ÷ 4 4 ÷ 4.5 4.5 ÷ 5 boom a a b b boom with swing-leg 001g02...
Page 14
45° 45° p. 14 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Release the gearmotor and loosen the rod nut. Manually turn the spring to increase or reduce the traction. The boom sh...
Page 15
26v 0v 230 0 rosso bianco blu arancione p. 15 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Control panel ⚠ warning! Before working on the control panel, cut off the main power s...
Page 16
L n l1t l2t m n + e - p. 16 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Electrical connections connect all wires and cables in compliance with the law while using suitable cabl...
Page 17
A b gnd a b s1 gnd 10 11 - + came 10 11 e1 e6 rx tx 1 2 3 3p 4 5 7 cx cy p. 17 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Power supply 230 v ac - 50/60 hz output to power 24 v...
Page 18
Af r700 r800 10 11 e1 e6 rx tx 1 2 3 3p 4 5 7 cx cy gnd a b s1 gnd p. 18 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Control devices antenna with rg58 cable open-close-invert f...
Page 19
Rx tx ./ # .# rx tx delta-s delta dir 10 11 e1 e6 rx tx 1 2 3 3p 4 5 7 cx cy 10 11 e1 e6 rx tx 1 2 3 3p 4 5 7 cx cy 10 11 e1 e6 rx tx 1 2 3 3p 4 5 7 cx cy rx tx ./ # .# rx tx dir / delta-s delta 10 11 e1 e6 rx tx 1 2 3 3p 4 5 7 cx cy p. 19 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e ...
Page 20
A b gnd a b gnd utp cat 5 1 2 3 4 1 2 3 4 rse rx tx ./ # .# rx tx dir / delta-s delta 10 11 e1 e6 rx tx 1 2 3 3p 4 5 7 cx cy 10 11 e1 e6 rx tx 1 2 3 3p 4 5 7 cx cy p. 20 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t a...
Page 21
~1° p. 21 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Establishing the limit-switch points close the inspection hatch and power up the system. Move the boom the check that it i...
Page 22
S1 gnd { { { 8 8 8 8 8 8 8 8 8 10” 1” p. 22 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Display the esc button is for: - exiting menus; - cancelling changes. The keys are for: ...
Page 23
P. 23 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . F9 obstruction detection with motor stopped with the barrier closed, open, or after a total stop, the gearmotor stays idle if ...
Page 24
P. 24 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . F31 closing slow-down speed setting the barrier's closing slow-down speed, calculated, calculated as a percentage. Warning! Th...
Page 25
P. 25 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . F63 com speed for setting the communication speed used in the crp (came remote protocol) connection system. 0 = 1200 baud / 1 ...
Page 26
Esc enter i esc enter 2 a esc enter - - - esc enter o p i esc enter a 3 esc enter i esc enter c l i esc enter o p i p. 26 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Travel cal...
Page 27
Esc enter 2 2 esc enter 2 u esc enter c l esc enter i esc enter i u esc enter 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 p. 27 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt...
Page 28
Esc enter 0 f 5 esc enter i f 5 p. 28 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Saving and uploading all data (users and configuration) with the memory roll procedure for mem...
Page 29
P. 29 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Troubleshooting problem reference check the barrier neither opens nor closes 1-2-3-4-6-8- 13-18 1 - lock the inspection hatch ...
Page 30
Slave master slave master slave master slave master slave master master slave p. 30 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Send the partial/pedestrian opening command (con...
Page 31
Master slave master slave master slave p. 31 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice . Paired operation important! Start by doing the following on both barriers: - fit the r...
Page 32
Came s.P.A. Via martiri della libertà, 15 31030 dosson di casier - treviso - italy tel. (+39) 0422 4940 - fax. (+39) 0422 4941 p. 32 - m anu al fa 0 0 5 7 1 -e n v. 1 - 0 8 /2 0 17 - © c a m e s .P .A . - t he co nt en ts of t his manu al ma y be c hange d, a t an y t ime , and wit h ou t n ot ice ....