Campbell CM375 Instruction Manual - Cm375 Table of Contents
CM375 Table of Contents
PDF viewers note: These page numbers refer to the printed version of this document. Use
the Adobe Acrobat® bookmarks tab for links to specific sections.
1. Overview.......................................................................1
1.1 Specifications............................................................................................1
1.2 Guy Duckbill Anchor Kits........................................................................2
2. CM375 Installation .......................................................3
2.1 Site Selection ............................................................................................3
2.2 Assembling Mast Sections........................................................................4
2.3 Lightning Rod Assembly and Mounting Instrumentation ......................12
2.4 Anchor Installation .................................................................................13
2.5 Raise, Plumb Mast and Final Cable Tensioning.....................................17
3. Maintenance ...............................................................19
Figures
1-1. 21720 Tote ..............................................................................................1
2.1-1. Assembled CM375 ...............................................................................3
2.2-1. CM375 in Opened Tote........................................................................4
2.2-2. Mast Sections and Base........................................................................4
2.2-3. Mast Section 1 Oriented on Base .........................................................5
2.2-4. Spikes Installation ................................................................................5
2.2-5. Coupler Installed in Top of Mast Section 1..........................................6
2.2-6. Bag Containing Hardware ....................................................................6
2.2-7. Mast Section 2 and Mast Section 3 ......................................................7
2.2-8. Guy Ring, Mast Section 2 and Mast Section 3.....................................7
2.2-9. 21663 Bottom Guy Kit .........................................................................8
2.2-10. Guy Cable Inserted into Guy Ring .....................................................8
2.2-11. Mast Section 3 and Guy Ring/Collar Assembly.................................9
2.2-12. Mast Section 4 Ready to be Installed in Mast Section 3 ....................9
2.2-13. Mast Section 5..................................................................................10
2.2-14. Mast Section 5 Installed in Mast Section 4 ......................................10
2.2-15. 21661 Guy Kit..................................................................................11
2.2-16. Mast Section 5 and Guy Ring/Collar Assembly...............................11
2.3-1. Lightning Rod Assembly....................................................................12
2.3-2. Installed Lightning Rod......................................................................12
2.4-1. Tape Measure in Slot for South Anchor.............................................13
2.4-2. 19282 Duckbill Anchor and Cable Assembly (left).
The 25699 has a threaded rod instead of the cable.
The drive rod (right) is used for both the 19282 and 25699...........13
2.4-3. Anchor Driven into Ground at 45° Angle ..........................................14
2.4-4. Locking Anchor..................................................................................14
2.4-5. Tape Measure in Slot for North East Anchor.....................................15
2.4-6. Turnbuckle Fastened to Guy Cable and Anchor ................................15
2.4-7. Top and Bottom Guy Cables Fastened to an Anchor .........................16
i