Campbell CR10 Replacement Procedure - Tools Required
Copyright © 2002 Campbell Scientific, Inc.
1
815 W. 1800 N., Logan, UT 84321-1784 (435) 753-2342
App. Note: 1D-T
CR10 PROM Replacement Procedure
This document will walk you through the procedure for replacing the firmware (PROM)
in a Campbell Scientific CR10 Measurement and Control System. If you prefer to have
Campbell Scientific install the PROMs (for a nominal fee), request a Returned Materials
Authorization (RMA) from Campbell Scientific.
This procedure erases data and programs stored in the CR10.
Before you begin, transfer all data and programs you wish to save
to a computer or storage module. For information about trans-
ferring data and programs between the CR10 and a computer, see
the CR10 Operator’s Manual.
To prevent components from being damaged by the discharge of
static electricity, the PROMs should be replaced at a grounded
work station by a person wearing a grounding strap.
Tools Required
• Phillips screwdriver #1
• PROM puller
or
Flat-blade screwdriver (shipped with CR10)
• New PROM