Canature RO 75 GPD 4 STAGE BP Installation And Operation Manual

Manual is about: Reverse Osmosis System

Summary of RO 75 GPD 4 STAGE BP

  • Page 1

    How to install, operate and maintain your reverse osmosis system insta llatio n a nd oper atio n m an ua l installers: please read all instructions before in- stalling and using this system. It is recommended to wait until the entire system is pressurized (including storage tank & faucet) and re-che...

  • Page 2: How Your System Works

    2 page how your system works 2 before you start 3 tools needed 3 system location 3 parts of the system 4 installing the filters 4 installing the membrane 5 installing the tank ball valve 5 installing the faucet 6 installing the self-piercing inlet saddle valve 7 installing the drain saddle 7 install...

  • Page 3: Before You Start

    3 before you start  your system contains filters which must be replaced periodically for proper operation. (refer to filter change schedule on page 9.)  read all steps and guides carefully before installing and using your ro system. Follow all steps exactly to correctly install.  the system is de...

  • Page 4: Parts Of The System

    4 parts of the system installing the filters when handling filter cartridges be sure hands are clean and sanitized or wear surgical gloves. 1. Loosen and remove filter housings using wrench provided. 2. Remove plastic wrapper from filter cartridges. Check the o-ring to insure it is lubricated. If no...

  • Page 5: Installing Tank Ball Valve

    5 installing tank ball valve the ro storage tank comes with a 3/8” shut off valve that must be installed. 1. Apply 5-6 wraps of teflon thread sealant tape to the male thread on the ro storage tank. 2. Install the shut-off valve and tighten until the gasket is compressed. Notes: while there is a gask...

  • Page 6: Installing The Faucet

    6 installing the faucet if the sink has a sprayer it may be disconnected for faucet installation. A pipe cap or plug will be necessary to seal the sprayer connection. The faucet should be positioned so it empties into the sink and the spout swivels freely for convenience. If sink has a hole that can...

  • Page 7: Installing The Unit

    7 installing the self-piercing inlet saddle valve the self-piercing saddle valve is designed for use with 3/8” to 1/2” od soft copper supply tubing. 1. Turn off cold water valve from under sink or main water line valve for whole house. 2. Before installing self-piercing valve, make sure piercing lan...

  • Page 8: Sanitize System

    8 installing tubing into fittings push the tube into the fitting and up to the tube stop pull on the tube to check that it is secure. Test the system before use. Cut the tube square and remove burrs and sharp edges. Ensure that the outside diameter is free from score marks. For soft or thin walled p...

  • Page 9: Filter Change Schedule

    9 filter change schedule recommended filter change schedule the following periodic maintenance is recommended so your system will provide years of trouble-free service: filter cartridges change schedule pre-filter (sediment) every 12 months pre-carbon (activated carbon) every 12 months post carbon (...

  • Page 10: Trouble Shooting

    10 trouble shooting problem cause solution no product water. 1. Water supply is turned off. 1. Turn on feed water. 1. Water supply is blocked. 1. Clear restriction. 2. Filters are plugged. 2. Replace pre-filter cartridge (s). 3. Feed water valve plugged or closed. 3. Open valve or unclog. 4. No drai...

  • Page 11

    11 spare parts list - ro 75 gpd 4 stage bp no part no description material quantity 1 41320004 cartridge housing-10 pp 3 2 65010001 sediment filter cartridge 10'',5 μm pp 1 3 41804003 cartridge housing oring epdm 3 4 70020002 tank 3.0 gallon 1 5 70030011 self piercing inlet saddle valve 1/4'' 1 6 80...

  • Page 12: Warranty

    12 warranty canature ro systems (excluding cartridge filters and membrane) are warranted to be free from defects in materials and workmanship under normal use within the operation specifications for a period of two (2) years from the date of manufacture or date of pur- chase when verified by a bill ...