Condura ROOM AIR CONDITIONER Owner's Manual - page 2
Location
Avoid installing the air conditioner where it is
exposed to direct sunlight.
The air conditioner should be installed with a
strong external support to minimize noise and
vibration and for the purpose of safe installation,
repair, replacement and secure positioning.
AIR CONDITIONING INSTALLATION
Installations of the unit into the wall
75~150cm
AWNING
About 10mm
Note: Unit may be supported by a solid frame
from below or by a hanger from a solid
overhead support.
BRICK
WALL
BRICK
WALL
AIR IN
AIR IN
LOUVER
AIR OUT
FRONT
100mm
100mm
45° BRICK CUT AWAY
TO CLEAR LOUVERS
45° BRICK CUT AWAY
TO CLEAR LOUVERS
AIR IN
AIR OUT
AIR IN
AIR IN
100mm minimum
Clean your air conditioner occasionally to keep it
looking new. Be sure to unplug the unit before
cleaning to prevent shock or fire hazards.
CARE AND MAINTENANCE
If the air filter becomes clogged with dust, smooth
air flow is obstructed and cooling efficiency
becomes low.
Air Filter Cleaning
Unscrew the front grille on both sides. Pull the filter
out of the unit.
Wash the filter using liquid dishwashing detergent
and warm water. Rinse filter thoroughly.
Gently shake excess water from the filter. Be sure
the filter is thoroughly dry before replacing.
Fix the unit with bracket and secure it with screws
Bracket
Dimension (Clearances)
W
H
Prepare an installation hole slightly bigger
than the outer wrapper size.
H = 314mm
W = 412mm
BRACKET
100mm