Dacor EHD3009 Installation Instructions Manual - page 6
5
Verifying Proper Operation
Connect to hood wiring
1. Installthefilters.
2. Installthelightbulbs.
-Attachtheincludedsuctioncuptoone
oftheprovidedlightbulbs.
-Insertitintooneofthelightfixtures.
- Screw it into place and remove the
sectioncup.
-Repeatfortheremaininglightfixtures.
3. Verify that the hood control knobs
areintheOFFposition(fullycounter-
clockwise).
4. Turnonthemainpowersupplyatthe
circuitbreakerpanelorfusebox.
5. Turnthelightandfanknobsclockwise
and make sure the lights and fans
operateproperly.
If the hood does not operate
properly, follow these
troubleshooting steps:
1. Verifythatpowerisbeingsuppliedto
the hood.
2. Check the electrical connections to
ensure that the installation has been
completedcorrectly.
3. Repeattheabovetest.
4. If the appliance still does not work,
contact an authorized Dacor service
company.Ifyouareunabletolocatea
DacorServicecompany,pleasecontact
Dacor at (800) 793-0093, or visit us
onthewebatwww.Dacor.com.Donot
attempttorepairtheapplianceyourself.
Dacor is not responsible for service
requiredtocorrectafaultyinstallation.
Connecting the Electrical Power
wARNINGS:
1. Ensure that the power
is disconnected before
proceeding.
2. Verify that power supply
matches the rating found on
the hoods data plate before
proceeding.
3. The hood must be properly
grounded at all times before
power is applied.
4. Do not ground the hood with
the neutral (white) house
supply wire. A separate wire
must be utilized.
5. If aluminum house supply
wiring is used, splice the
hoods copper wires to the
aluminum house wiring with
special connectors designed
and agency-certified for this
purpose. Follow the connector
manufacturer’s recommended
procedure carefully. Improper
connection can result in a fire
hazard.
6. Failure to complete electrical
connections properly may
result in a damaged or a non-
functional system. Follow the
wiring diagrams carefully to
ensure a proper installation.
Model EhDR series hoods only:
1. Installtheremoteorin-lineblower(see
page4forspecifications)accordingto
theblowerinstallationinstructions.
2. Route the wiring from the in-line or
remote blower into the hood through
one of the electrical access holes in
thehood.Connectthemtotheremote
blower (ILB8/REMP3) connection
terminal as shown below. Match wire
colors.
wARNINGS:
A minimum of two people are
required to safely lift the hood.
1. Removethefiltersfromthehoodcanopy
andremovetheshieldsbelowthepower
ventilator.
2. The hood comes pre-wired from the
factory. Route the supplied cable
throughtheelectricalaccessholethat
willbeusedfortheinstallationlocation.
3. Mounta2X4ledgerboardtosupport
the hood temporarily in the mounting
location, 30” (762mm) above the
finishedcountertop.
4. Whileliftingthehoodontothetopofthe
ledgerboard,routethewiringharness
from the hood to the power supply
connectionpoint.
3. Securethehoodthroughthekeyhole
slotsinthetopofthehoodand/orthe
slotholeintherearofthehood.
4. Removethetemporarysupportledger.
Installing the hood
Top
mounting holes
(both sides)
Temporary
support ledger.
Rear
mounting holes
Wiring
harness
Wiring
harness
Top mounting holes
(both sides)
Temporary
support ledger.
Rear
mounting holes
Temporary Support Ledger Installation
(9”MHDserieshoodshown)
Temporary Support Ledger Installation
(18”MHDserieshoodshown)
L1
N1
Gnd
GREEN
WHITE
BLACK
GREEN
WHITE
BLACK
Not used
Wires connected to hood
wiring harness, do not remove
ILB/REMP wiring terminal
inside hood
Wires from in-line/remote
blower
Connectthepre-wired,whiteandgreen
wirestothecorrespondingblack,whiteand
ground(green)wirefromthepowersource
wiring.Usewirenutconnectorstosecure
theconnections.