E-Z UP SPEED SHELTER Manual - ’
*3.
Attach the top to the
frame by matching the quick
attachment strips on the top
with the strips on the frame.
Push the strips firmly togeth-
er at each corner.
7.
To engage the slider at
each corner, first lift the fabric
off of the corner, then with
one hand hold the top of the
leg while pushing up on the
slider with the other hand.
The pull pin will engage
the hole. Pull down the fab-
ric valance over the slider.
Repeat on all four corners.
4.
Store shelter in cover
bag.
3.
Grasp the top and bot-
tom of diamond on 8’ sides.
Lift the shelter up slightly
and shake it while stepping
towards your partner until the
unit is 3/4 closed. With each
partner grasping two outer
legs, push frame together to
fully close it.
Be careful not to pinch fingers.
1.
With partner, slightly lift
up two adjacent outer legs,
depress toggle and telescope
inner legs into outer legs.
Repeat on the opposite legs
- making sure to do two legs
at a time.
2
.
Release pull pin at each
corner. With one hand push
up on truss near the pull pin,
pull the pin out to release.
Note: It is much easier to
release pull pin when the
shelter weight has been
removed from the pull pin.
6.
With partner on 8’
sides, opposite side of shel-
ter, stand facing one another.
Grasp the bottom of the dia-
mond shaped area of trusses
on opposite sides. Lift up and
step backward until shelter is
3/4 opened, being careful
not to pinch fingers.
*4.
To secure the top to
frame, line up grommet holes
on fabric valance with bolts
on frame.
*1.
Place your E-Z UP
®
frame in the center of area to be
shaded. With partner on opposite side, grasp two outer
legs, slightly lift off ground and step backwards, stopping
at full arms’ length.
*2.
Gently unfold the fabric top and place it over the
open frame.
Fabric Top
Trusses
Top Attachment Nut
Coin
Spacers
*5.
Unscrew top attach-
ment nut from bolt. Place
grommeted fabric top over
the bolt, screw on top attach-
ment nut and tighten until
snug. Top should rotate
easily - do not overtighten.
Repeat this procedure on the
remaining grommets.
8.
Lift two adjacent outer
legs up and slide out the
inner legs until the toggle
locks. Repeat on the oppo-
site legs - making sure to do
two legs at a time.
Top Attachment Nut
Angle Bracket
Pull Pin
Note: Once top is permanently attached, only perform
steps 1 and 6 - 8 to set up.
H
ow
t
o
t
ake
d
own
w
Hat
’
s
i
n
t
He
B
ox
• 1 8’ x 12’ Frame Fully Assembled
• 1 Wrench Kit
*Note: First Time Attachment Is Required.
Top and frame are shipped separately to avoid damage.
A first time set up requires that top be bolted on to the frame.
This first time set up takes longer than future set ups. Once
top is permanently attached to frame, set up and take down
are easily accomplished within seconds.
f
irst
t
iMe
t
op
a
ttaCHMent