EarthWay 2170 Assembly And Operating Instructions Manual

Summary of 2170

  • Page 1

    P lease call us if you have any difficulty with this spreader before returning to the store . W e can be reached via phone at 800-294-0671 or 574-848-7491 m onday —f riday 9: ooam ~ 3:00 pm or online at www . Earthway . Com assembly and operating instructions for earthway e v -n-s pred ® model 2170 ...

  • Page 2

    4. Install gearbox by inserting the pinion shaft into hole in center of hoppers bottom. The word “front” on the gearbox must point to f ront of the hopper. 5. Install axle bearings to both lower handles. Note: notch on bearings and lower handles. Bearings must go through flat side of lower handle. 3...

  • Page 3

    7. Slide axle bushing over axle and into axle bearing to both sides as shown. 8. Install drive wheel to axle using pin hole nearest to lower handles as shown. Insert 2” cotter pin through wheel and through axle. Bend with pliers to prevent pin from falling out. 10. Note: before installing gauge and ...

  • Page 4

    13. Install handle shaft to lower handles and pivot & bracket assembly as shown. Using 1/4-20 x 1-3/4” bolts and lock- nuts. T ighten bolts and nuts now . 14. Install (1) 1/4-20 regular nut ( not a locknut ) on to control rod as shown. Next install the two 1/4-20 x1” stainless steel bolts into holes...

  • Page 5

    18. Tension on the flow control lever may be adjusted by tightening or loosening the tension nut as shown. Warranty earthway guarantees this product to be free of defects in original workmanship and materials for a period of 90- days from sale to the original user. If any defect develops during this...

  • Page 6

    Ke y # part # de s cription ke y # part # de s cription ke y # part # de s cription 1 40003 screen 14 12344 handle spacer 29 36105 1/8" x 1 1/4" cotter pin 2 60335 hopper assembly, includes key #4 & 22 15 31100 1/4-20 x 1 1/2" bolt 30 12274 handle grip 3 33117 agitator 16 25223 handle shaft 31 60334...