EarthWay C24HD Assembly And Operating Instructions Manual

Summary of C24HD

  • Page 1

    Earthway earthway ev-n-spred ev-n-spred ® ® gt gt c24hd & c24hds-nc b roadcast s preader assembly and operating instructions r ev 3.10 36210 qty 2 36214 qty 4 36200 qty 8 36205 qty 3 36300 qty 17 36207 qty 2 36305 qty 2 33117 qty 1 36105 qty 1 36104 qty 1 36103 qty 1 36404 qty 18 vvvvvvvv vvvvvvvv u...

  • Page 2

    3. Install impeller onto pinion shaft. Insert 1/8” x 1-1/4” cotter pin through impeller then through pinion shaft. Use hole nearest gear box. Spread cotter pin to prevent from falling out. Next, install the cross brace through the gearbox brace support as shown above. Fron t pinion shaft 1/8 x 1-1/4...

  • Page 3: If You Have Any Questions

    7. Install drive wheel to axle using pin hole nearest to lower handles as shown. Insert 2” cotter pin through wheel and through axle. Bend with pliers to prevent pin from falling out. Next install coast wheel to axle, and then using outside pin hole on the axle (as shown on the left), insert 1” cott...

  • Page 4

    5 1 0 15 3 0 insert control rod into pivot bracket attach 1/4-20 regular hex nuts at these points. Notice the position of the double bend point. 30 calibration point 1/4-20 x 1-1/2” hex head bolt with cupped washer 1/4-20 lock nut and cupped washer 11. Install handle shaft to lower handles and pivot...

  • Page 5

    18. For normal operation both doors should be fully opened. To reduce flow to the left side, partially or completely close the door over the rear (large) hole. To reduce flow to the right side, partially or completely close the door over the front (small) hole. Close both doors for a narrow center s...

  • Page 6: C24Hd & C24Hds P

    Vvvvvvvv vvvvvvvv 6 7 5 5 4 5 6 33 30 5 26 20 11 11 14 32 9 11 28 11 22 34 31 25 13 2 27 16 3 1 8 77002 optional heavy-duty rain cover 21 5 29 23 5 9 22 11 5 24 22 24 12 15 12 11 18 19 18 17 10 35 35 35 35 35 35 35 60060r optional heavy-duty rain cover & side deflector kit earthway products, inc. P....