EarthWay C25HD Assembly And Operating Instructions

Summary of C25HD

  • Page 1

    Assembly and operating instructions for earthway e v -n-s pred ® c25hd & c25hds tow broadcast spreaders rev 10-07 helpful hints: read the directions before assembly if your spreader does not spread evenly, be sure the front on the gear box toward the tow hitch. The impeller must turn clock- wise. Re...

  • Page 2

    Assembly continued step 4: place the drive wheel (either wheel can be used) on the axle and secure with the long cotter pin and bend. (note: drive wheel side has the cross-hole in the axle closest to the frame as shown) fig 1 step 5: place the coast wheel on the axle and secure with the short cotter...

  • Page 3

    Calibrating your spreader: to start your calibration 1. Open shut-off fully so that the holes in the bottom of the hopper are open completely. Fig 1 2. Move the rate control stop to #30 and tighten, then move the rate control handle to #30. Fig 2 3. Adjust the nuts on the pivot to lock the calibrati...

  • Page 4

    C25 series tow broadcast spreader parts list 60063r 60166r key # part # description key # part # description key # part # description 1 40003 screen 12 21555 hitch plate c25hdp 22 n/a 1/8" x 1 1/4" cotter pin 2 60219 hopper assembly, includes key #7 13 42251 clevis pin 23 12109 impellor 3 n/a 1/4-20...