Echo 99944200615 Operator's Manual - Pas R
PAS R
APid
L
oAdeR
TM
C
uRved
S
hAfT
T
RiMMeR
A
TTAChMenT
o
PeRAToR
'
S
M
AnuAL
9
nylon
lIne
head
InsTallaTIon
/
removal
1. Align locating hole in upper plate with hole in bearing housing and
insert 5 mm (3/16 in.) diameter locking tool (A).
2. Place large washer (B) then line head (C) on threaded shaft, fol-
lowed by small metal washer (D) and locknut (E).
3. Install 3/8-24 locknut using 14.5 mm (9/16 in.) wrench. Turn lock-
nut clockwise, and tighten securely.
IMPORTANT
Remember to remove the locking tool.
4. To remove line head, reverse assembly instructions.
plasTIC
shIeld
InsTallaTIon
Caution
Wear Gloves or personal injury may result:
• Cutoff knife is sharp.
• Gearcase and surrounding area may be hot.
Parts Required: Plastic Shield Assembly
1. Remove wing nut (A), washer (B), and bolt (C).
2. Snap the shield over the bearing housing.
3. Install bolt (C), washer (B), and wing nut (A).
A
B
C
D
E
A
B
C
A
A
C