Eclipse BoostPak Installation Manual

Manual is about: packaged gas booster system

Summary of BoostPak

  • Page 1

    Eclipse boostpak packaged gas booster system model ms, mr and mh 630-2 installation guide 6/22/2010 version 2.

  • Page 2: Note

    2 copyright copyright 2007 by eclipse, inc. All rights reserved worldwide. This publication is protected by federal regulation and shall not be copied, distributed, transmitted, transcribed or translated into any human or computer language, in any form or by any means, to any third parties, without ...

  • Page 3

    3 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 table of contents 1 introduction............................................................................................................................ 4 product description ...................................................

  • Page 4

    4 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 introduction product description the eclipse boostpak is designed for installations when the gas pressure to a building is inadequate to operate the appliances. It provides a reliable cost-effective packaged solution for pumpin...

  • Page 5

    5 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 safety important notices for safe operation of the boostpak system will be found in this section. To avoid personal injury, damage to property or the facility, the following warnings must be observed. Read this entire manual be...

  • Page 6

    6 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 installation introduction in this chapter you will find information and instructions needed to install the boostpak and system components. The system drawings are shipped with the boostpak. Refer to the data sheet for the drawi...

  • Page 7

    7 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 piping support use brackets or hangers to support the gas piping. If you have questions, consult your local gas company. Initial fitting • remove any shipping materials and inspect for foreign objects in the piping. • connect i...

  • Page 8

    8 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 wiring for appliance on demand operation, start circuit interlock this control mode requires a customer supplied run interlock. It must be a dry (voltage free) contact that makes continuity when the booster is required and open...

  • Page 9

    9 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 commissioning introduction in this chapter you will find information and procedures for the first operation and adjustment of the boostpak. Ŷ only qualified personnel, with good mechanical and electrical aptitude should adjust,...

  • Page 10

    10 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 commissioning record models ms/mr/mh nameplate information boostpak model ______________ serial number ______________ control panel serial number ______________ mechanical installation ambient temperature ______________ mounti...

  • Page 11

    11 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 mh models temperature control settings setup function factory algor ctralg pdmr _______________ tuning pb 6 _______________ mr 45 _______________ rate 0 _______________ outalg outalg rly _______________ input1 in1typ jl ______...

  • Page 12

    12 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 operation introduction in this chapter, you will find instructions on how to start and stop the booster system. Become familiar with booster control methods before operating the equipment. Ŷ the boostpak system, described here...

  • Page 13

    13 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 maintenance & troubleshooting monthly checklist • inspect and tighten loose mechanical components • look for signs of damage and repair • test operation if the unit has not run and check for excessive vibration • clean the boo...

  • Page 14

    14 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 cannot initiate start sequence if used, inlet high gas pressure switch has activated normal operation, when the inlet pressure drops below the switch setting, then the system will start. Motor starter overload tripped check fo...

  • Page 15

    15 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 boostpak model ms, mr, and mh wiring diagram phantom componnents marked 1 are installed on boostpak models with the heat exchanger option. Phantom components marked 2 are installed on boostpak models with the flow control opti...

  • Page 16

    16 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 boostpak model ms, mr, and mh wiring diagram, continued 5 detail “a” single phase incoming power without the ups option detail “f” used when the boostpak unit is mounted inside and the booster motor is 1/2 or 3/4 hp detail “b”...

  • Page 17

    17 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 booster motor voltage heat exchanger motor voltage 115 vac/1 phase/60hz 208 vac/1 phase/60 hz 230 vac/1 phase/60 hz 208 vac/3 phase/60 hz 230 vac/3 phase/60 hz 460 vac/3 phase/60 hz 1/4 hp 1/2 hp 3/4 hp 1 hp 2 hp 5 hp 115 vac/...

  • Page 18

    18 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 panel layout and enclosure internal view, panel 13”h x 17”w enclosure 16”h x 20”w x 8”d 100 70 80 90 g y r b y eclipse combustion innovative thermal solutions rockford, illinois, u.S.A. Www.Eclipsenet.Com.

  • Page 19

    19 eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 boostpak model ms piping schematic boostpak model mr piping schematic boostpak model mh piping schematic outlet inlet outlet inlet outlet inlet.

  • Page 20

    I conversion factors metric to english metric to metric english to metric from to multiply by cubic meter (m³) cubic foot (ft³) 35.31 cubic meter/hr (m³/h) cubic foot/hr (cfh) 35.31 degrees celsius (°c) degrees fahrenheit (°f) (°c x 9/5) + 32 kilogram (kg) pound (lb) 2.205 kilowatt (kw) btu/hr 3415 ...

  • Page 21

    Eclipse packaged gas boostpak, v2, installation guide 630-2, 6/22/2010 ii key to system schematics symbol appearance name remarks bulletin/ info guide hermetic booster booster is used to increase gas pressure. 630-1 control panel the control panel encloses the booster motor starter, smart replay/ pl...

  • Page 22

    Offered by: power equipment company 2011 williamsburg road richmond, virginia 23231 phone (804) 236-3800 fax (804) 236-3882 www.Peconet.Com.