Faber INCA PRO 30 RB Installation Instructions Manual

Summary of INCA PRO 30 RB

  • Page 1

    Version 10/05 - page 1 read these instructions before you start installing this rangehood warning: - to reduce the risk of a range top grease fire: a) never leave surface units unattended at high settings. Boilovers cause smoking and greasy spillovers that may ignite. Heat oils slowly on low or medi...

  • Page 2: Warning

    Version 10/05 - page 2 venting requirements determine which venting method is best for your application. Ductwork can extend either through the wall or the roof. The length of the ductwork and the number of elbows should be kept to a minimum to provide efficient performance. The size of the ductwork ...

  • Page 3: Avertissement

    Version 10/05 - page 3 rÈglements d'Évacuation confirmer la sortie d'évacuation - soit par le mur, soit par le toit. Utilisez une longueur de tuyauterie minimale avec les moindres de coudes pour la plus grande efficacité. Le diamètre de tuyauterie doit être uniforme. N'installez jamais 2 coudes ensemb...

  • Page 4

    Version 10/05 - page 4 proliner 36 stainless (620000301) designed for 36” wide installations cadre pro 36 axier inoxydable (620000301) peut être employée les hottes encastrable sur mesure de 36" liner dimensions / dimensions du cadre rangehood dimensions / dimensions de la hotte inca pro 30 pre-plan...

  • Page 5: Warning

    Version 10/05 - page 5 inca pro 30 can be used with custom hoods 30” wide and up. Choose either a custom liner or our proliner designed for 36" wide installations. Liners create a perfectly-sealed, non-combustible finish for the underside of your custom/wood hood. The proliners are made up of two se...

  • Page 6

    Version 10/05 - page 6 plan your ductwork to ensure that the blower performs to its highest possible capacity, ductwork should be as short and straight as possilbe. The ductrun should not exceed 35 equivalent feet if ducted using the required minimum of 6" round duct. Calculate the length of the duc...

  • Page 7

    Version 10/05 - page 7 install the rangehood 1. Remove the rangehood from the carton and place on a flat sur- face. Cover the surface to prevent accidental damage. Remove all parts including the backdraft damper and literature package before discarding the carton. 2. Place the round damper into the e...

  • Page 8

    Version 10/05 - page 8 light on/off button ( l ) on/off switch for the halogen lights. Move the switch to "1" to turn the light on and to "0" to turn it off. Blower on/off button ( m ) on/off switch for the blower. Move the switch to "1" to turn the blower on and to "0" to turn it off. Blower speed ...

  • Page 9

    Version 10/05 - page 9 inca pro 30 outils nÉcessaires À lʼinstallation • scie sauteuse ou à découper • perceuse • mèche à bois 1 1/4 po • pinces • tournevis phillips • dénude fil ou couteau tout usage • pince coupante à fil métallique • ruban à mesurer ou règle • niveau • crayon • outil à calfeutrage ...

  • Page 10

    Version 10/05 - page 10 plan du conduit pour assurer que le ventilateur marche le mieux, le conduit doit être aussi court et aussi droit que possible. La longueur du conduit ne doit jamais excéder 35 pi sʼil sʼagit de conduit rond de 6 po. Calculer la longueur du conduit en ajoutant lʼéquivalent en ...

  • Page 11

    Version 10/05 - page 11 figure 6 installation de la hotte 1. Retirer lʼappareil de la boîte et le déposer sur une surface plate pour lʼassemblage. Couvrir la surface pour éviter tout dommage. Retirer toutes les pièces incluant les vis, le registre à clapet et le nécessaire de documentation avant de ...

  • Page 12

    Version 10/05 - page 12 0 1 0 1 0 1 2 l m v bouton marche-arrêt de la lumière (l) interrupteur marche-arrêt pour la lumière. Régler à « 1 » pour mettre en circuit (on) ou à « 0 » pour mettre hors circuit (off). Bouton marche-arrêt du ventilateur (m) interrupteur marche-arrêt pour le ventilateur. Rég...