    Str series wood and coal boiler installation and maintenance manual fabrika sk s.R.O., pavla mudroŇa 5,01001 Žilina slovakia tel: +421908 599 938, e-mail:world@fabrikask.Sk.

  • Page 2

    Thank you for buying our product! Introduction 1.The boilerand and all associated equipment must be installed and used in accordance with the installation design, all applicable legal regulations and technical standards and with manufacturer´s instructions.The boiler may be used only for the purpose...

  • Page 3

    1 drawing of the boiler series str plus type of the boiler str plus 25 str plus 35 str plus 45 width of the boiler w 555 555 555 boiler depth l 700 800 900 l1 500 600 700 water connection water outlet vk 2“ 2“ 2“ return water rk 2“ 2“ 2“ eductive valve ½“ ½“ ½“ chimney diameter mm 150 150 180 d 147 ...

  • Page 4

    2 packing of the boiler series str plus measurements str plus 25 str plus 35 str plus 45 packaging width w 640 640 640 packaging depth l 710 790 890 packaging height h 1220 1220 1220 3 boiler combustion system: str plus series boilers are designed so that the exhaust warmth air gave a heat to the th...

  • Page 5

    4 technical parameters type str plus 25 str plus 35 str plus 45 nominal heat output (black coal – walnut) kw 23 – 25 32 - 35 42 - 45 nominal heat output (hardwood –split logs) kw 20 – 22 27 – 30 34 – 37 minimum heat output kw 11,5 13,9 18,5 heating water maximum temp. °c 90 heating return water mini...

  • Page 6

    5.2 r ecommended fuel -recommended fuels for str boilers are coal, coke and firewood. -optimal coal and coke granularity is 24-60 mm. -optimal firewood size is logs of diameter 40-100 mm. Their lengh will depnded on how many kw size. -fuel must be stored in a dry place. To reach the boiler nominal o...

  • Page 7

    Regulation hatch (fig.02) air rosette (fig.03) thermometer (fig.04) 6.5 t emperature safety valve the l boilers are equipped with a safety valve (fig.06) which ensures dissipation of excessive heat without additional device and supply of external energy in such a way that the maximum permissible bol...

  • Page 8

    6.6 h ydraulic c onnection d iagram it is suggested hydraulic system should be installed according to following schemes. Open expansion tank system (fig. 06) 1.Safety heat exchanger(sht) 2.Safety valve(ts 131,sts20) 3.Water supply 4.System safety valva (3bar-1/2“) 5.Check valve 6.Mixing valve 7.Syst...

  • Page 9

    Please note the service technician must show the user how to control the boiler and enter the date when the boiler was put into service into the warranty certificate. 7.2 f illing up draining the heating system the system can olny been filled up or topped up with water which meets the parameters spe...

  • Page 10

    -provide a minimum 5 cm gap to be between top point of the fuel and ceiling of stoking chamber when boiler is stocked. 8.4 o vernight heating mode this mode i sused when you want to maintain the fire in the boiler for instance oven night.First csarpe all ash out the combustion chamber,with the chimn...

  • Page 11

    The combustion chamber,it must be removed with a scraper or burnt with hard wood(orcoke),running the boiler at maximum operating temperature. Please note ashes should be stored (by using proper glove) in a noncombustible container properly and transported outdoors.Other waste must not be stored in t...

  • Page 12

    10.3 h eating water requirements heating watwer requirements are specified i en standards.When the sum of conncentrations of calcium and magnesium in the water exceed 1.8 mmol/l, additional non-chemical teatments preventing line deposition must be considered(e.G. Magnetic or electrostatic field trea...

  • Page 13

    12 installation procedure -place the boiler body on a non-flammable materials. -install a temperature safety valve,watch for the arrow indicating the water flow direction.It must be as shown in (fig. 05). After conncting the boiler to the heating system,screw filling and drain stopcoks into the back...

  • Page 14

    14 troubleshooting 15 instructions for purchaser-conditions for guarantee and complaints: 1) complaints of completeness of the delivery can be exercised in accordance with the commercial code and civil code at the supplier. The buyer is obliged to accept and immediately check the completeness, quant...

  • Page 15

    4) in case of failure of a component, this component will be repaired or changed within a guarantee period after the damaged component has been delivered with covered cost for the transport by customer. 5) guarantee is valid if the product is being used as described and determined in the letter of g...

  • Page 16

    16 record of performed guarantee repairs record of performed repairs within guarantee period and after date of the record performed activity organization (signature, stamp) signature of the customer.

  • Page 17: Letter of Guarantee

    Fabrika sk s.R.O., pavla mudroňa 5, 010 01 Žilina, slovakia letter of guarantee str series wood and coal boiler this warranty replaces the certificate of quality and completeness. The manufacturer confirms that the boiler meets the conditions required quality, is complete to the extent provided docu...

  • Page 18: Declaration Of Conformity

    Declaration of conformity issued by § 12 par. 3 point. A) act. 264/1999 z.Zand 97/23 ec we fabrika sk ltd. Pavla mudroňa 5 Žilina 010 01 Žilina slovakia vat: sk2023540431 declare under our full responsibility that the products meet the requirements of technical regulations, products that the conditi...

  • Page 19: Letter Of Customer

    Fabrika sk s.R.O., pavla mudroňa 5, 010 01 Žilina, slovakia letter of customer name: ................................................................................. Surname: .......................................................................... Company: ...........................................