Fadini Girri 130 Installation Manual

Summary of Girri 130

  • Page 1

    Gb ® installation manual.

  • Page 2

    Cover lid elpro 15 plus control box general line switch 137 special helical gear manual release shoes cover lock keys nut and locknut to fix the operator centring base plate ground fixing long screws back cover optional fan cover optional cooling fan electric motor cut off limit switch assembly limi...

  • Page 3

    3 fixing detail with parts layout of the electro-mechanical gate operator girri 130 cover lid pic. 1 first remove the lid by means of the supplied keys; this will reveal the electronic control box with its transparent plastic cover, the operator base plate, the knob to release the cog for hand opera...

  • Page 4

    4 pic. 2 pic. 4 before setting the fixing base plate with concrete fully screw up the 4 long bolts so that the threads are all out. Set the plate horizontally levelled as shown in the illustration at 80 mm from the gate. Corner “a” of girri 130 base plate is to coincide with the reference line drawn...

  • Page 5

    Release knob limit striking plate left-hand limit striking plate right-hand limit switch rod toothed rack with fixing brackets 5 pic. 8 pic. 6 once fixed the operator on its concrete mounting you can carry on fixing the toothed rack by means of the supplied brackets and screws. The position of the t...

  • Page 6

    6 pic. 10 pic. 9 limit switch with two cut off micro-switches earth flashing lamp miri 4 with bracket and aerial birio 8 logic cut off switch plug-in radio receiver astro type pushbuttons pulin 3 wall mounted keyswitch prit 19 electronic programmer elpro 15 plus lid receiver trifo 11 photocell trans...

  • Page 7

    7 girri 130 the wires from the electronic programmer to the electric motor have a 1.5 mm square section. For the limit switches, the photocells, the keyswitch/push buttons and other accessories 1.0 mm square section wires can be used; but for the mains and the flashing lamp the recommended section i...

  • Page 8

    The electronic control panel elpro 15 plus, new generation, is designed to operate the sliding gate operator girri 130. Power supply is 230v 50hz single-phase. Built in full compliance with bt 93/68/ce low voltage and emc 93/68/ce electro-magnetic compatibility regulations. Fitting operations are re...

  • Page 9

    Pic. 13 • please note that a low voltage cut off switch is fitted to the right side of the control box. The contacts are closed when the operator lid is put back (pic. 13). • instead of the low voltage cut off microswitch (ie. Logic switch) see pic. 13, you can request and have a line switch fitted ...

  • Page 10

    • it is recommended to make all the connections as described in the diagram no. 4136 which is included inside the control box; the diagram describes the features of the control panel and how to plug in the radio receiver for the automatic operation by transmitter (pic. 12). • also, should the motor ...

  • Page 11

    11 pic. 19 if, during the first run test, you realize that the electric motor turns in the wrong direction and the limit switch rod is not activated (that is when the limit switch rod is pushed in the same direction of the gate, which does not stop), you must remove the cover and reverse the positio...

  • Page 12

    275 10° 270 210 240 30 103 300 175 270 120 55 175 overall dimensions fixing base plate via mantova, 177/a - 37053 cerea (verona) italy - tel. +39 0442 330422 r.A. - fax +39 0442 331054 - e-mail: info@fadini.Net - www.Fadini.Net european mark certifying conformity to the essential requirements of the...