Feniex AI-0817 Instruction Manual - page 8
Feniex Industries, Inc.
1.800.615.8350 /
feniex.com
8
Wiring Diagram
Color:
Function: Connection
Black
Ground
Connects to the
negative terminal
of the vehicle's
battery.
Red
Battery
(+12VDC)
Connects to the
positive terminal
of the vehicle's
battery.
Gray
Controller
Connects to the
RJ45 Port in the
AI Controller
*See page 4 for fuse specifications
Vehicle's Battery
FUSE*
Antenna
1.) Connect the AI Controller to the AI Light
Bar using the RJ45 cable.
2.) Mount the Antenna on the roof the
vehicle and connect it to the controller
Wiring Instructions
3.) Connect the light bar to the battery,
attaching the red 12V+ wire to the positive
terminal of the vehicle's battery. Ground
the black wire or connect it to the 12V-
terminal of the vehicle's battery.
4.) Press the power button twice to turn on
the controller and light bar.