Fiamm Premium HF flex Technical Manual

Manual is about: 3-phase battery charger

Summary of Premium HF flex

  • Page 1

    Fiamm motive power ® premium hf flex technical manual gb.

  • Page 2

    Contents warning..................................................................... 2 aim of this manual....................................................2 guarantee...................................................................2 recommendations..................................................

  • Page 3

    Equal to 6mm 2 ; this cable must be as short as possible. Before opening the equipment for the purposes of adjustment, replacement of components, maintenance or repairs, it must be disconnected from all sources of electri- cal power (including mains and battery power). The battery must only be disco...

  • Page 4

    Introduction the premium hf flex range of chargers enable batteries to be recharged from the 3-phase mains supply. The premium hf flex chargers can recharge automatically batteries in the following ranges 24-36-48v or 48-72-80v. The microprocessor control automatically recognises the battery’s volta...

  • Page 5

    6 the menus provide access to the following functions: • view of the last 100 measurements (memory menu). • view of the fault and alarm statuses, etc. (status menu). • charger configuration (configuration menu). • parametering the contrast (contrast menu), the display’s back-lighting (backlight menu...

  • Page 6

    7 the information on these screens can be reset to zero via the reset line on the configuration menu. Symbol condition when charging complete normal. Abnormal (voluntary interruption or interruption following a fault). Table b: symbols for condition when charging complete. Status this menu displays ...

  • Page 7

    8 unpacking the charger is supplied with the following components: • a 2m-long mains cable. • a 3m-long battery cable. • the present instruction manual. Mechanical installation the charger must be mounted on the wall in a vertical position. The lower part of the charger must be at least 0.60m from t...

  • Page 8

    9 initiating desulphation before charging desulphation of an unsealed lead/acid battery: • either starts automatically when the battery is heavily discharged; the length of the desulphating operation is defined by the charger’s electronics. The charging process is initiated automatically at the end ...

  • Page 9

    10 if the battery remains connected, in order to keep it charged, compensation and subsequent equalisation charging operations will be initiated automatically, depending on the type of battery. 2. If an equalisation charging operation has been programmed (unsealed lead/acid battery), this is initiat...

  • Page 10

    12.2011 / subject to revisions without prior notice european headquarters: enersys emea eh europe gmbh löwenstrasse 32 8001 zürich switzerland phone: +41 44 215 74 10 fax: +41 44 215 74 11 enersys ltd oak court clifton business park wynne avenue swinton manchester m27 8ff phone: 0161 794 4611 fax: 0...