FPI Dell-Point Europa 75 Owners & Installation Manual - Operating Instructions

Summary of Dell-Point Europa 75

  • Page 1

    Fpi fireplace products international, ltd. 6988 venture st., delta, bc, canada v4g 1h4 918-419 e 09/12/07 europa 75 important: save these instructions. Owners & installation manual warning: improper installation, adjustment, alteration, service or maintenance can cause injury, property damage, or lo...

  • Page 2

    Greenfire gf75-1 bioenergy stove 2 gf75-1 to the new owner congratulations! You are the owner of a state-of-the-art stove by fpi. Thank-you for purchasing a fpi fireplace product. The pride of workmanship that goes into each of our products will give you years of trouble-free enjoyment. Should you h...

  • Page 3: Table of Contents

    Greenfire gf75-1 bioenergy stove 3 table of contents greenfire bioenergy stove safety label ..................................................................4 installation important: save these instructions ...............................5 before you start .............................................

  • Page 4: Safety Label

    Greenfire gf75-1 bioenergy stove 4 safety label this is a copy of the label that accompanies each gf75-1. We have printed a copy of the contents here for your review. The safety label is located on the back panel of the stove. Note: fpi units are constantly being improved. Check the label on the uni...

  • Page 5: Installation

    Greenfire gf75-1 bioenergy stove 5 inst alla tion important: save these instructions the gf75-1 stove must be installed in accordance with these instructions. Carefully read all the instructions in this manual fi rst. Consult the building authority having jurisdiction to determine the need for a perm...

  • Page 6: Installation

    Greenfire gf75-1 bioenergy stove 6 inst alla tion chimney installation important: always use an approved 3” (76mm) pl type vent system which is approved for venting while burning corn. Using a different size vent will result in poor performance or eventual malfunction of your appliance which is not ...

  • Page 7: Installation

    Greenfire gf75-1 bioenergy stove 7 inst alla tion installation corner installation alcove installation minimum hearth requirement adjacent w all st ove 8 1/2” (152mm) 3” (76mm) f 3” (76mm) backwall f stove 6” (152mm) 30” max (762mm 8” (203mm) 6” (152mm) f back of stove stove 6” (152mm) 6” (152mm) 6”...

  • Page 8: Installation

    Greenfire gf75-1 bioenergy stove 8 inst alla tion installation vent termination requirements 1. Do not terminate the vent in any enclosed or semi-enclosed areas that can build up a concentration of fumes. 2. Vent surfaces can become extremely hot. Keep children away from such areas. Non-combustible ...

  • Page 9: Installation

    Greenfire gf75-1 bioenergy stove 9 inst alla tion installation horizontal termination top view side view diagram 4.

  • Page 10: Installation

    Greenfire gf75-1 bioenergy stove 10 inst alla tion outside vertical termination installation 6” min 6” min hearth pad outside air tee with cleanout support bracket 3” (76 mm) clearance flashing rain cap 24” (610mm) side view diagram 5.

  • Page 11: Installation

    Greenfire gf75-1 bioenergy stove 11 inst alla tion installation vertical termination 6” min type ‘l’ vent tee optional outside air highly recommended 6” min 6” min 6” min hearth pad 3” min 2” min 3” min outside air support bracket 3” (76 mm) clearance flashing rain cap 6” min hearth pad 24” (610mm) ...

  • Page 12: Installation

    Greenfire gf75-1 bioenergy stove 12 inst alla tion existing class "a" chimney installation 3” min outside air 3” (76 mm) clearance flashing 6” min hearth pad class a chimney class a chimney must maintain clearances outlined in the chimney’s installation instructions (usually 2”) class a chimney ceil...

  • Page 13: Installation

    Greenfire gf75-1 bioenergy stove 13 inst alla tion installation existing masonry chimney cover plate (non-combustible). Under edges of cover plate and storm collar must be sealed with silicone storm collar vertical cap this flexible section of pipes must be no longer than 5ft, and must also be the f...

  • Page 14: Operating Instructions

    Greenfire gf75-1 bioenergy stove 14 opera tion icon/display description 1 & 2 pre-set at factory combustion blower 3 & 4 pre-set at factory ash-extraction a display settings 1 to 20 for icons 1-2-3-4 5 & 6 heat level 1 to 5 b display settings 1 to 5, c1 & c2 and error codes 7 wood pellet fuel settin...

  • Page 15: Operating Instructions

    Greenfire gf75-1 bioenergy stove 15 opera tion 918-422e quick restart in case of a short power failure without battery back-up, there is a possibility of starting the unit only if fl ames are present in the burn pot. Caution: never use gel or matches if the fl ame or the fuel bed contains red embers...

  • Page 16: Operating Instructions

    Greenfire gf75-1 bioenergy stove 16 opera tion operating instructions control panel functions heat level settings use icon 5 to decrease or icon 6 to increase the intensity of your desired heat. (btu) heat level 1 is regulated with a fl ow of approximately 1 lb (.45 kg) of fuel per hour and the heat ...

  • Page 17: Operating Instructions

    Greenfire gf75-1 bioenergy stove 17 opera tion operation guidelines for burning corn and wheat important: compared to wood pellets, agricultural based fuels such as corn or wheat require extra care, attention and understanding. Failure to adhere to these operating instructions could lead to ash auge...

  • Page 18: Operating Instructions

    Greenfire gf75-1 bioenergy stove 18 opera tion operating instructions high fuel/ember bed control if under the above display conditions, you have accumulated a high fuel/ember bed, the following guidelines should help you eliminate the problem and stabilize the fuel bed for future use. These should ...

  • Page 19: Maintenance

    Greenfire gf75-1 bioenergy stove 19 maintenance maintenance maintenance maintenance schedule using wood pellets maintenance schedule using corn or wheat components of stove each start up weekly monthly annually r emove ashes in b urn - pot x c heck the ash removal system x e mpty the ash pan x v acu...

  • Page 20: Maintenance

    Greenfire gf75-1 bioenergy stove 20 maintenance before each start-up, always check the level of ashes in the ash pan and remove if necessary. “be sure to dispose of in a metal container and remove to outside of the building.” embers can stay hot for a long time after the fi re has been extinguished. ...

  • Page 21: Maintenance

    Greenfire gf75-1 bioenergy stove 21 maintenance maintenance of the ash-extraction system step 1: refer to diagram 21 to determine the condition of the three stainless steel ash screws. It can happen that the sugar released by the fuels containing corn or wheat can stick on the ash screws resulting i...

  • Page 22: Maintenance

    Greenfire gf75-1 bioenergy stove 22 maintenance maintenance inspection of the seals at the start of each season, check gaskets on the door, fuel door and ash door by using a strip of paper which you will slip at several places between the seal and the stove (see diagram 28). If the gaskets need to b...

  • Page 23: Maintenance

    Greenfire gf75-1 bioenergy stove 23 maintenance maintenance minimum burning capacity 8,500 btu/h (when burning wood pellets) 1 lb/h maximum burning capacity 34,000 btu/h (when burning wood pellets) 4 lb/h effi ciency of the burn-pot approximately 85% combustion fan power varies from 25 cfm to 45 cfm ...

  • Page 24: Troubleshooting

    Greenfire gf75-1 bioenergy stove 24 tr oubleshoo ting troubleshooting troubleshooting important: always disconnect your stove before doing any maintenance or repairs. Only a qualifi ed technician should take care of any electrical problems. Error code problem solution ee shows when stove is connected...

  • Page 25: Troubleshooting

    Greenfire gf75-1 bioenergy stove 25 tr oubleshoo ting troubleshooting high temperature thermodisk 300-50f (installed on the wall) auger feed motor vacuum switch ash-extraction motor combustion fan a power supply converts the ac power to 12 volts dc thermodisk 110-20f white wires (installed on the co...

  • Page 26: Notes

    Greenfire gf75-1 bioenergy stove 26 notes ___________________________________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ __________________________________________________...

  • Page 27: Warranty

    Greenfire gf75-1 bioenergy stove 27 warranty gf75-1 model manufacturers warranty fpi offers five years warranty coverage against manufacturers defects on the steel structure of the appliance. Parts and *subsidized labour. Fpi offers two years warranty coverage against manufacturers defects on the co...

  • Page 28

    Printed in canada © copyright 2007, fpi fireplace products international ltd. All rights reserved..