Fram King 25 Series Operator And Parts Manual - page 16
16
7. If your tractor is not equipped with a Quick Hitch:
- Align the left lower link arm with the mounting pin.
- Slide the ball over the pin and install the Linch Pin.
- Use the screw jack on the right lift arm to align the ball with the pin.
- Slide the ball over the mounting pin and install the Linch Pin.
- Level the frame using the screw jack.
- Remove the retainer and pin from the mast.
- Align top link using the turnbuckle.
- Insert pin and install Linch Pin.
- Level frame using the turnbuckle.
8. Attach the PTO driveline:
- Check that the driveline telescopes easily and that the shield rotates freely.
CAUTION
Be sure that the driveline does not bottom out when going
through its working angles.
- Attach the driveline to the tractor by retracting the locking pin, slide the yoke over the shaft
and push on the yoke until the lock pin clicks into position. Pull on the yoke to be sure it is
locked in position.
- Attach the anchor chain on the driveline shield to the frame.
9. Use the 3-point hitch to raise the machine.
10. Remove the blocks from under the Depth Gauge Shoes.
11. Reverse the above procedure when unhooking from the tractor.
Field Operation
Buhler Farm King 25 Series Rotary Tillers are designed with the inherent flexibility of operating
well in almost any kind of soil and terrain conditions. However, the operator has the responsibility
of being familiar with all operating and safety procedures and following them.
Each operator should review this section of the manual at the start of the season and as often as
required to be familiar with the machine. When using, follow this procedure:
1. Review and follow the pre-operation checklist. Review Safety Instructions.
2. Attach the tractor to the machine.
3. Before going to the field review Transporting Section, pull into the field and position the
machine in a level area.
4. Lower into working position.
Operation - 25 Series Rotary Tiller