Freeflow Spas Accent Instructions Manual - Service Cost

Summary of Accent

  • Page 1

    X page x x pre-delivery instructions please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure the safe, secure, and timely installation of your new spa. The following sections are guidelines on how to prepare for delivery and set-up of ...

  • Page 2: Deck Installation

    Site selection and preparation important: site selection and preparation are your responsibility. Carefully read these instructions and consult your authorized dealer if you have any questions. You probably have a spot picked out for your new spa, whether it’s indoors or outdoors, on a patio or on a...

  • Page 3: Delivery Access

    Delivery access first, locate the dimensions of your spa on the following chart. The dimensions shown are the measurements of the spa in the vertical position, laid on its side. Next, contact your dealer to find the height and width added by the delivery cart which the dealer will use to deliver you...

  • Page 4: Ground Preparation

    X page x x it may be necessary to remove a gate, part of a fence, or other movable obstructions in order to roll the spa to its installation site. About ten percent of the time, a crane is the only way to install the spa by lifting it to its final destination. If the spa has to be taken off of the c...

  • Page 5: Dimensions

    7’3” excursion 34” 24” 2” 21” 25” 50.5” 54.5” 6’5” x page x x page 5 pre-delivery instructions excursion, solstice & monterey dimensions note: all dimensions are approximate; measure your spa before making critical design or pathway decisions. (bottom view) (front view) door drain electrical door si...

  • Page 6: Accent & Azure

    Accent 33” 25” 3” 10” 15.5” 33” 36” 5’3” 6’9” accent & azure dimensions note: all dimensions are approximate; measure your spa before making critical design or pathway decisions. (front view) (bottom view) x page x x pre-delivery instructions page 6 drain electrical door side upside down view of sp ...

  • Page 7: Calistoga

    Calilstoga 34 1/4” 25” 2” 4” 4” 25.5” 6’6” x page x x page 7 pre-delivery instructions calistoga dimensions note: all dimensions are approximate; measure your spa before making critical design or pathway decisions. (front view) (bottom view) door drain electrical door side upside down view of sp a.

  • Page 8: Tristar

    Tristar 4” 4.5” 25.5” 3” 25” 31” 6’ 6’ 3’5 ” 2’10” x page x x tristar dimensions note: all dimensions are approximate; measure your spa before making critical design or pathway decisions. (front view) (bottom view) pre-delivery instructions page 8 door door side upside down view of sp a drain electr...

  • Page 9: Cascina

    X page x x cascina 22” 31¾” 13” 28” 49” 54” 5’10” 5’2” x page x x page 9 pre-delivery instructions cascina dimensions note: all dimensions are approximate; measure your spa before making critical design or pathway decisions. (front view) (bottom view) door door side upside down view of sp a drain el...

  • Page 10: Electrical Requirements

    X page x x electrical requirements to ensure you will have an opportunity to use your spa soon after delivery, it is very important that the required electrical service has been installed. Unless otherwise stipulated by your dealer, this is your responsibility. Important: all electrical circuits mus...

  • Page 11

    X page x x a licensed electrician should install a four-wire electrical service (two line voltages, one neutral, one ground) from the main electrical service panel to the subpanel, and from the sub-panel to the spa per the appropriate wiring diagram as illustrated below. Your electrician should moun...

  • Page 12: Service Cost

    X page x x x page x x pre-delivery instructions page 12 services available from your spa dealer service cost pre-delivery site inspection _____________ deliver spa to installation site _____________ unwrap spa and haul away packaging material _____________ set up _____________ fill the spa with wate...

  • Page 13: Contractor Suggestions

    X page x x x page x x page 13 pre-delivery instructions contractor suggestions electrician name: ______________________________________________________________________________ telephone: ______________________________________________________________________________ name: ____________________________...

  • Page 14

    X page x x x page x x pre-delivery instructions page 14 this page left intentionally blank.

  • Page 15: Spa Specifications

    X page x x spa specifications caution: watkins manufacturing corporation suggests a structural engineer or contractor be consulted before the spa is placed on an elevated deck. * note: the “filled weight” and “dead weight” of the spa includes the weight of the occupants (assuming an average occupant...

  • Page 16

    X page x x watkins manufacturing corporation 1280 park center drive vista, california 92081 (888) 961-7727 ©2014 watkins manufacturing corporation. Part #62914.14 rev. A (1/14) ®.