Gage Bilt GB740 Installation Manual

Summary of GB740

  • Page 1

    Gb740 installation tool gage bilt made in u.S.A. Gage bilt inc. 44766 centre court (586) 226-1500 clinton twp. Mi 48038 (586) 226-1505 fax e-mail: solutions@gagebilt.Com / www.Gagebilt.Com gage bilt tools are available worldwide e-mail us for a distributor near you..

  • Page 2

    2 rev. 3/13 table of contents description page warnings ............................................................................................................................................... 3 principle of operation ..............................................................................

  • Page 3: Safety Warnings

    3 rev. 3/13 warning do not pull fastener unless it is placed in an assembly, pin will eject forcibly when pintail breaks off. Severe personal injury may result. Warning do not operate without stat-o-seal (s572) and cap screw (402482). Pressurized hydraulic fluid may cause severe personal injury. War...

  • Page 4

    4 rev. 3/13 principle of operation when the trigger is depressed, the pressurized air inside of the tool is released allowing spring pressure to move the valve spool causing the air to be redirected. The air is directed to the top of the air piston, moving it in a downward direction. The air below t...

  • Page 5

    5 rev. 3/13 how to use the gb740 warning: operator must read and understand all warnings and cautions. Warning: it is required that eye protection and hearing protection be worn during operation. Warning: do not pull rivet in the air. Personal injury from fastener ejecting may occur. Warning: air is...

  • Page 6

    6 rev. 3/13 description warning : the balance of this tool is designed for horizontal use and is not ergonomically best suited for all applications. Gage bilt will be pleased to advise for your specific application. The gb740 is a pneumatic-hydraulic tool designed specifically for the efficient inst...

  • Page 7

    7 rev. 3/13 troubleshooting providing all maintenance conditions have been met, follow this systematic approach to diagnosis. 1. More than one pull is required to break rivet. A) tool needs to be bled. (see filling and bleeding instructions.) b) spring has fatigued, replace. C) jaws are stripped or ...

  • Page 8

    8 rev. 3/13 overhaul the disassembly and re-assembly procedure can be accomplished by utilizing the following instructions and drawings. Use extreme care during disassembly and re-assembly not to mar or nick any smooth surface that comes in contact with seals. Before installing seals, always apply a...

  • Page 9

    9 rev. 3/13 handle to inspect air cylinder bore, remove base cover (744124) and o’ring (s12). Any further disassembly will require removal of the head assembly first. For complete disassembly, start by removing parts (744124) and (s12). Next, holding tool upright, remove four button -head cap screws...

  • Page 10

    10 rev. 3/13 first aid skin: wash thoroughly with soap and water as soon as possible. Casual contact requires no immediate attention. If irritation develops, consult a physician. Ingestion: seek medical attention immediately. Do not induce vomiting. Eyes: flush with copious amounts of water. If irri...

  • Page 11: Gb740 - Selection Chart

    11 rev. 3/13 gb740 - selection chart fastener dia. Straight right angle 1, 2 offset 1 1/8 4c-740b-52 4c-715-54ra 4c-715-40os 5/32 5c-740b-52 5c-715-54ra 5c-715-40os 3/16 6c-740b-52 6c-715-54ra 6c-715-40os 1/4 8c-740b-52 1/8 4a-740b-52 4a-715-54ra 4a-715-40os 5/32 5a-740b-52 5a-715-54ra 5a-715-40os 3...

  • Page 12

    12 rev. 3/13 declaration of conformity we declare that the equipment specified herein conforms to the following standards and directives. En12100-1 & en12100-2 en13849 en792-1:2000+a1 council directive: machine directive 2006/42/ec equipment description: gb740 fastener installation tools manufacture...