Garden Oasis PEAKED TOP GAZEBO Owner's Manual - 10X10 Peak Roof Gazebo

Summary of PEAKED TOP GAZEBO

  • Page 1

    Ksn: 0-04015009-6 upc code: 749241312113 manual date of purchase: _____/ _____/ _____ peaked top gazebo 1 owner' s.

  • Page 2: 10X10 Peak Roof Gazebo

    10x10 peak roof gazebo assembly instruction tips: warning: keep all flame and heat sources away from this tent fabric. This tent is made with fabric that meets cpai-84 specifications for flame resistance. It is not fire proof. The fabric will burn if left in continuous contact with any flame source....

  • Page 3

    Preparation: before beginning assembly, make sure all parts are present. Compare parts with package contents list and hardware contents list. If any part is missing or damaged, do not attempt to assemble the product. Estimated assembly time: approx. 2 hours tools required for assembly (not included)...

  • Page 4

    4 step 1 a. Insert base cap (#2) into post (#1), then fit base flange (#3) underneath post (#1) . B. Insert screw 1 (#14) through post (#1) and secure the base flange (#3), slide down base cap (#2) into place as show. C. Repeat step a & b for balance 3 post sets..

  • Page 5

    Step 2 a. Attach left crossbar (#4) and right crossbar (#5) using center connector (#6) , and attach using screw 1 (#14). B. Repeat for balance 3 crossbar sets. 5.

  • Page 6

    6 step 3 a. Place crossbars atop posts and attach using bolt (#16). The bolt (#16) should be through crossbars then secure on the posts. B. Ensure that all screw holes on crossbars inside of structure facing toward the screw..

  • Page 7

    7 step 4 a. Insert corner roof tube (#7) and center roof tube (#8) into roof connector (#9). B. Then, attach center roof tube (#8) with center connector (#6) by using screw 2 (#15) and nut (16). C. Secure corner roof tube (#7) onto post (#1) by using screw 1 (#14). D. Then, raise base cap (#2) and s...

  • Page 8

    8 step 5 a. Position one person on 5 ft. Ladder, following ladder’s safety recommendations to avoid danger, so that person can reach top of gazebo. B. Place fabric cover (#11) on top of the gazebo. Screw the finial (#10) to the roof connector (#9), slowly twist finial (#10) until fastened. C. Open f...

  • Page 9: Storage:

    User maintenance instructions storage: in preparation for winter storage, remove leaves and dirt, dry and wrap in polybag to prevent rusting. Store in dry place. Treat frame periodically with liquid wax for maximum protection against uv rays and moisture. Fabric covers clean with a soft brush and lu...