Gardenline GLBV 2500 08/2014 Operating Instructions & User Manual - Instructions
10
Instructions
4
Before starting the equipment
Before you connect the equipment to the mains supply make sure that the data
on the rating plate is identical to that of your mains supply. Always disconnect the
power before making adjustments to the equipment.
Start up the equipment only when fully assembled. Always inspect the power
cable for damage before starting up. The equipment may be used only if the cable
is in perfect condition.
Fitting the suction tube (Fig. 3a-3d)
First plug together the front suction tube (1), the rear suction tube (2) and the rear
blower tube (3) (Fig. 3a). Then screw together the tubes using the screws provided
(Fig. 3b/Item 11). Finally, plug the suction tube into the motor housing (Fig. 3c)
and screw it in place with the screw (Fig. 3d/Item 11) and with one screw on each
side (Fig. 3d/Item 12).
Fitting the debris bag (Fig. 3e-3f)
First hang the eyelet on the hook on the suction tube (Fig. 3e). Then slip the debris
bag (Fig. 3f/Item 7) connector over the port on the motor housing. Make sure that
there is an audible click when the plastic latches engage.
Fitting the carrying strap (Fig. 3g)
Pass the carrying strap (Fig. 2/Item 4) through the metal eyelet as shown in Fig. 3g
and close the quick fastener.
NOTE!
Do not disassemble the suction tube once it has been assembled.
AFTER SALES SUPPORT
GB
IRE
0151 649 1500
1890 946244
GLBV 2500, 8027, 08/2014
www.einhell.co.uk
Fig. 3b
11
11
Fig. 3a
2
3
1