Goldline GVA-24 Installation Manual

Summary of GVA-24

  • Page 1

    Installation manual for model gva-24 www.Goldlinecontrols.Com 888-921-7665 copyright © 2008 goldine controls 092051b ld c g line on trols limited warranty goldline warrants its aqua rite, aqua rite pro, aqua trol, aqua logic and pro logic products (products with goldline part numbers starting with a...

  • Page 2: Import

    1 maintenance the gva-24 has two seals which should be lubricated every year. These o-ring seals are located at the top and bottom of the actuator, where the shaft exits the actuator housing. The top o-ring requires the removal of the handle, and the bottom requires that the gear train is disengaged...

  • Page 3

    Description the gva-24 goldline valve actuator rotates 2-port and 3 port valves automatically. Use it with the aqua logic system or gl-235 solar controller to automate pool/spa operation, solar heating, cleaner operation, water features, or a variety of other uses. The industry standard configuratio...

  • Page 4

    3 mounting instructions if the valve is plumbed with port 2 as the common port and the main body of the actuator is mounted over port 2 (standard mounting), there is no need to adjust the actuator cams. 1. Remove locking knob and handle. Set aside for reinstallation later. 2. Remove four (4) screws ...